Hamamatsu Station
Riding today
Live departures from this stationAbout this station
History, melodies, surroundingsThe station opened as the terminus of the government railway line from Hamamatsu to Ōbu, operated by the Railway Bureau, later the Ministry of Railways and then Japanese National Railways.
Machine translation — show Japanese original
鉄道局(のちの鉄道省→日本国有鉄道〈国鉄〉)による浜松 - 大府間の官設鉄道線開通により、その終点として開業。
The government railway was extended to Shizuoka, connecting with the existing line to Shinbashi, and became an intermediate station.
Machine translation — show Japanese original
官設鉄道が静岡まで延伸し、新橋までの既存線と直結。途中駅となる。
The line name was established and it became part of the Tōkaidō Line, which was later renamed the Tōkaidō Main Line in 1909.
Machine translation — show Japanese original
線路名称制定。東海道線(1909年に東海道本線に改称)の所属となる。
The station building was rebuilt into a modern Western-style structure, the second version.
Machine translation — show Japanese original
駅舎を洋風の近代的建物に改築(2代目)。
The second station building was lost to the Hamamatsu Air Raid.
Machine translation — show Japanese original
浜松空襲により2代目駅舎焼失。
The tracks in the station premises were destroyed for a length of 800m due to naval gunfire.
Machine translation — show Japanese original
艦砲射撃により駅構内の線路が800mにわたり破壊。
The third-generation station building, a two-story wooden structure, was completed.
Machine translation — show Japanese original
木造2階建の3代目駅舎完成。
The Tokaido Shinkansen opened, becoming a transfer station, with the existing line platforms connected by an overpass.
Machine translation — show Japanese original
東海道新幹線が開業。乗換駅となる。在来線ホームとは、跨線橋により連絡
The Shinkansen platform was extended to accommodate 16-car trains.
Machine translation — show Japanese original
新幹線のホームが16両対応に延伸される。
Part of the freight handling operations were transferred to the newly established Nishi-Hamamatsu Station.
Machine translation — show Japanese original
貨物取扱業務の一部を新設の西浜松駅に移管。
Cargo handling was completely abolished, and at the same time, freight transport on the Enshu Railway Nishi-Kajima Line ended, and the receipt of freight cars from Japanese National Railways at Enshu-Makome Station was terminated.
Machine translation — show Japanese original
貨物の取扱を全廃。これと同時に遠州鉄道西鹿島線の貨物輸送が終了し、遠州馬込駅で行われていた国鉄からの乗り入れ貨車の収受が終了した。
The elevated structure of the Tokaido Main Line was completed, resulting in the integration of the station with the Shinkansen platforms that had been newly constructed separate from the Tokaido Line.
Machine translation — show Japanese original
東海道本線の高架化完成。これにより駅は東海道線から離れて設置された新幹線ホームと一体化。
The Shinkansen Hikari began making stops.
Machine translation — show Japanese original
新幹線「ひかり」が停車開始。
With the privatization of Japanese National Railways, it becomes a JR East station.
Machine translation — show Japanese original
国鉄分割民営化により、JR東海の駅となる。
Hamamatsu Station building "MayOne" opened.
Machine translation — show Japanese original
浜松駅ビル「MayOne(メイワン)」開業。
Automatic ticket gates were introduced at conventional line ticket gates.
Machine translation — show Japanese original
在来線改札口に自動改札機導入。
The south entrance exterior was renovated.
Machine translation — show Japanese original
南口外観を改装。
Automatic ticket gates were introduced at Shinkansen ticket gates.
Machine translation — show Japanese original
新幹線改札口に自動改札機導入。
Two elevators and two escalators were newly installed on the existing line.
Machine translation — show Japanese original
在来線にエレベーター・エスカレーターが各2基新設される。
Work began on seismic reinforcement and improvement within the facility.
Machine translation — show Japanese original
構内の耐震補強および改良工事に着手。
The in-station commercial facility "Meiwan Ekimachi West" opened, resulting in a major change to the station's internal layout, including the locations of the ticket office, travel center, shops, and toilets.
Machine translation — show Japanese original
構内商業施設「メイワン エキマチ・ウエスト」開業。なおこれにより構内の構成(乗車券売場・旅行センター・売店・トイレ等の位置)が大きく変更になった。
The in-station commercial facility "Meiwan Ekimachi・East" opened.
Machine translation — show Japanese original
構内商業施設「メイワン エキマチ・イースト」開業。
Seismic reinforcement and in-yard improvement work was completed.
Machine translation — show Japanese original
耐震補強および構内改良工事が完工。
The electronicization of interlocking devices was completed, marking the completion of JR East's plan to introduce electronic interlocking to its major stations and vehicle bases.
Machine translation — show Japanese original
連動装置の電子化が完了。これをもってJR東海の主要駅・車両基地などの電子連動化計画が完了した。
The IC card "TOICA" became available for use on the Tokaido Main Line.
Machine translation — show Japanese original
東海道本線でICカード「TOICA」の利用が可能となる。
A commercial facility centered on the "Meiwan Bic Camera Building" opened under the elevated structure on the west side of the station.
Machine translation — show Japanese original
駅西側高架下に「メイワン ビックカメラ館」を核とした商業施設を開業。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Getting around
Platforms, transfers and navigationCommunity Photos
Photos shared by riders. Been to this station? Add yours.
Hamamatsu Station FAQ
What train lines connect at Hamamatsu Station?
Hamamatsu Station is served by Tokaido Shinkansen.