菊名

Kikuna Station

Live Network Status Active

Kikuna is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
42 Events
1908 9月23日

Yokohama Railway opened the section between Higashi-Kanagawa and Hachioji Station, with no station being established near the current Hon-Station area.

Machine translation — show Japanese original

横浜鉄道が東神奈川 - 八王子駅間開通。現在の本駅付近には駅は設置されず。

1926 2月14日

Tokyo-Yokohama Electric Railway's Kikuna Station opened.

Machine translation — show Japanese original

東京横浜電鉄の菊名駅が開業。

1926 9月1日

The Railway Ministry's Kikuna Station opened.

Machine translation — show Japanese original

鉄道省の菊名駅が開業。

1927 3月

The Kikuna Connecting Line was opened.

Machine translation — show Japanese original

菊名連絡線が開通。

1927 3月

The Kikuna Connecting Line was opened.

Machine translation — show Japanese original

菊名連絡線が開通。

1966 9月

The Kikuna Connecting Line was abolished.

Machine translation — show Japanese original

菊名連絡線が撤去される。

1966 9月

The Kikuna Connecting Line was abolished.

Machine translation — show Japanese original

菊名連絡線が撤去される。

1970 3月14日

The business scope was revised from general freight transport to passengers, luggage, parcels, and small package cargo.

Machine translation — show Japanese original

営業範囲を一般運輸営業から旅客、手荷物、小荷物及び小口扱貨物に改正。

1970 4月1日

The business scope was revised from passengers, luggage, small packages, and small freight to passengers.

Machine translation — show Japanese original

営業範囲を旅客、手荷物、小荷物及び小口扱貨物から旅客に改正。

1972 7月27日

To solve the problem of Tokyu's tracks being flooded during heavy rain, the Yokohama Line also elevated its tracks, and at the same time, the relative-style platforms were converted to island-style platforms.

Machine translation — show Japanese original

大雨時に東急の線路が冠水する問題を解決するため横浜線も線路を嵩上げ。同時期に、相対式ホームから島式ホーム化される。

1972 7月27日

To address the issue of Tokyu's tracks flooding during heavy rain, the tracks were elevated, and the station building was rebuilt as an elevated station, which also led to the expansion to 2 platforms with 4 tracks and the completion of a siding, but this siding was rarely used except in emergencies until 1988 when Hibiya Line through trains started operating.

Machine translation — show Japanese original

大雨時に東急の線路が冠水する問題を解決するため線路を嵩上げすることとなり、それに合わせて駅舎を橋上駅舎化。この際に2面4線化され引き上げ線も完成する。この引き上げ線は1988年に日比谷線直通列車が乗り入れるまで非常時以外はほとんど使用されず、時々レールの錆取りなどに回送列車などが使用していた。

1974

The Tokyu Store Kikuna branch opened inside Kikuna Station.

Machine translation — show Japanese original

駅本屋内に東急ストア菊名店が開業。

1982 4月1日

The introduction of 8-car trains consisting of large 20 m cars to express services began, and the practice of not handling doors at this station on the Tokyu Line started.

Machine translation — show Japanese original

急行列車に大形20 m車8両編成の投入が開始され、東横線当駅でのドア非扱いが始まる。

1987 4月1日

With the privatization of JNR, the station became part of JR East, with management continuing to be handled by Tokyu.

Machine translation — show Japanese original

国鉄分割民営化によりJR東日本の駅となる。駅の管理は引き続き東急が行う。

1988 8月9日

With the timetable revision, the operating section of the Hibiya Line direct train was extended to this station due to the improvement work at Hiyoshi Station, and in addition to weekday mornings, rapid and local train connections were also implemented in the evenings.

Machine translation — show Japanese original

ダイヤ改正により、日比谷線直通列車の運転区間が日吉駅改良工事に伴い当駅まで延伸される。また、平日の朝に加え、夕方以降にも急行との緩急接続を実施するようになる。

1989 12月

In 1989, work began on the Okurayama - Kikuna continuous elevated crossing project to eliminate the non-treatment of doors at the current Tokyu Toyoko Line station.

Machine translation — show Japanese original

(平成元年):東横線当駅のドア非扱い解消のため、大倉山 - 菊名間連続立体交差事業(大倉山 - 菊名間踏切除却立体交差工事)に着手。

1991

The improvement work on the Tokyu Toyoko Line's Hiyoshi Station was completed, and the daytime through operation zone to the Hibiya Line was extended to the same station.

Machine translation — show Japanese original

東横線日吉駅の改良工事が完成し、日中の日比谷線直通運転区間が同駅までとなる。

1993 3月23日

With the progress of the elevated crossing construction to eliminate the level crossing between Tsunashima and Kikuna on the Toyoko Line, the Tsunohazu 3rd crossing adjacent to the station was abolished (passage was possible until the previous day).

Machine translation — show Japanese original

東横線大倉山 - 菊名間踏切除却立体交差工事の進捗に伴い、当駅に隣接していた大倉山3号踏切が廃止される(前日まで通行可)。

1993 3月31日

The non-treatment of doors on the first car on the Shibuya side of 8-car 20m long trains at this station on the Toyoko Line was ended, with all cars having their doors treated starting from April 1 of the following year.

Machine translation — show Japanese original

東横線当駅における大形20 m8両編成の渋谷方1両のドア非扱いを終了。翌4月1日からは全車両のドア扱いとなる。

1994

A transfer gate was installed midway through the transfer passage with the Tokyu Toyoko Line, and at the same time, the station building for JR East's ticketing and gate was completed, and JR East began managing the Yokohama Line section, which had been previously entrusted to Tokyu.

Machine translation — show Japanese original

東横線との乗換通路途中に連絡改札が設置される。これと同時にJR東日本の出札改札用の駅舎も完成し、横浜線部分は従来の東急委託からJR東日本が管理を開始。

1994

A transfer gate was installed midway through the transfer passage to the Yokohama Line.

Machine translation — show Japanese original

横浜線との乗換通路途中に連絡改札が設置される。

1995 3月17日

The platform construction and pedestrian overpass were completed, marking the end of the approximately 5-year Tokyu Line Okurayama - Kikuna continuous grade separation project.

Machine translation — show Japanese original

ホームの本設工事・跨線人道橋が完成する。およそ5年強におよんだ東横線大倉山 - 菊名間連続立体交差事業(大倉山 - 菊名間踏切除却立体交差工事)が竣工。

2001 3月28日

With the timetable revision, express operations began, and all-day fast-slow connections were implemented at this station.

Machine translation — show Japanese original

ダイヤ改正により、特急運行を開始。また、当駅で終日緩急接続を実施するようになる。

2001 11月18日

IC card "Suica" becomes available for use on JR East.

Machine translation — show Japanese original

JR東日本でICカード「Suica」の利用が可能となる。

2002 3月

The up platform on the Tokyu Line was expanded by up to 1.3m.

Machine translation — show Japanese original

東横線上りホームが最大1.3m拡幅される。

2006 3月18日

Due to a timetable revision, it became a stop for rapid services on the Yokohama Line, the third addition of a Yokohama Line rapid stop.

Machine translation — show Japanese original

ダイヤ改正により、横浜線を走行する快速の停車駅となる(横浜線快速停車駅追加は第3号である)。

2007 8月23日

Due to a timetable revision, through trains on the Hibiya Line will operate only to this station all day, as work is being carried out on the Yokohama and Motomachi-bound platforms at Nishi-Magome Station to change the route from the Tokyu Line to the Meguro Line at Hiyoshi Station.

Machine translation — show Japanese original

ダイヤ改正により、日吉駅2・3番線ホームを東横線から目黒線への発着路線変更に伴う工事を行うため、日比谷線直通列車は終日当駅までの運転となる。

2009 10月31日

The regular ticket sales office ended its operations.

Machine translation — show Japanese original

定期券売り場の営業を終了。

2010 3月

The guide signs installed on the platform are updated to the new energy-saving type (thin reflective transparent film type).

Machine translation — show Japanese original

ホームに設置されている案内サインが、新しい省エネタイプ(薄型反射透過フィルム型)に更新される。

2013 3月15日

With the start of mutual direct operation between the Tokyu Line and the Fukutoshin Line on March 16, the direct operation of the Hibiya Line, which had extended to this station, will come to an end.

Machine translation — show Japanese original

3月16日の東横線と副都心線の相互直通運転開始に伴い、当駅まで乗り入れた日比谷線直通運転が終了となる。

2016 3月21日

The down platform began using platform doors.

Machine translation — show Japanese original

下りホームでホームドアの使用を開始。

2017 3月20日

The up-platform began using platform doors.

Machine translation — show Japanese original

上りホームでホームドアの使用を開始。

2017 12月17日

With the start of operation of the new station building, the use of the west exit elevator began, and the transfer ticket gate was abolished.

Machine translation — show Japanese original

新駅舎の供用開始に伴い、西口エレベーターの使用を開始。連絡改札が廃止になる。

2017 12月17日

The west entrance elevator began operation and the transfer gate was abolished.

Machine translation — show Japanese original

西口エレベーターの使用を開始。連絡改札が廃止になる。

2018 2月28日

Elevator use inside the ticket gates began, and barrier-free construction was completed.

Machine translation — show Japanese original

改札内のエレベーター使用開始。バリアフリー工事終了。

2018 7月29日

A new central ticket gate on the JR side was established and the east ticket gate was relocated.

Machine translation — show Japanese original

中央改札(JR側)を新設。東改札移設。

2018 11月25日

The east ticket gate returns to its original location.

Machine translation — show Japanese original

東改札が従来の場所に戻る。

2019 3月16日

Two limited express trains originating from this station began operating to Ogawamachi Station on the Tobu Tojo Line.

Machine translation — show Japanese original

当駅始発の急行2本が東武東上線の小川町駅までの運行になった。

2020 3月16日

The renewal construction of Tokyu Station was completed, with a Lawson+toks, Shibuya Shibusoba, and Mitsubishi UFJ Bank ATM being installed inside the station.

Machine translation — show Japanese original

東急駅のリニューアル工事が完成。駅構内にローソン+toks、渋谷しぶそば、三菱UFJ銀行のATMが設けられる。

2021 11月7日

The use of Smart Home Doors began on the Yokohama Line platforms.

Machine translation — show Japanese original

横浜線ホームでスマートホームドアの使用を開始。

2021 12月20日

The Midori no Madoguchi service ended operations.

Machine translation — show Japanese original

みどりの窓口の営業を終了。

2022 2月1日

Introduced ticket vending machines with voice guidance.

Machine translation — show Japanese original

話せる指定席券売機を導入。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (TY TOKYU TOYOKO LINE)
3・4 Down
横浜 · 元町 · 中華街方面{{Cite web|和書|url=https://www.tokyu.co.jp/railway/timetable/pdf/202303_ty16_kikuna2.pdf|title=東横線標準時刻表 菊名駅 横浜
Platforms 3, 4 serve this line

Transfers from this platform

Yokohama Line JR-East
5 min Moderate
PLATFORM LAYOUT (YOKOHAMA LINE)
1 Up
東神奈川 · 横浜 · 大船
2 Down
新横浜 · 町田 · 八王子
Platforms 1, 2 serve this line

Transfers from this platform

TY Tokyu Toyoko Line Tokyu
5 min Moderate

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kikuna Station FAQ

What train lines connect at Kikuna Station?

Kikuna Station is served by TY Tokyu Toyoko Line, Yokohama Line.