北柏

Kita-Kashiwa Station

Live Network Status Active

Kita Kashiwa is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
18 Events
1969 3月

Construction on the freight station began.

Machine translation — show Japanese original

貨物駅の着工開始。

1970 3月

The establishment of a passenger station was approved.

Machine translation — show Japanese original

旅客駅の設置が承認。

1970 4月10日

It opened as a Japanese National Railways freight station.

Machine translation — show Japanese original

日本国有鉄道の貨物駅として開業。

1970 8月6日

The groundbreaking ceremony for the passenger station was held.

Machine translation — show Japanese original

旅客駅の起工式が行われた。

1971 4月20日

Passenger operations began.

Machine translation — show Japanese original

旅客営業開始。

1984 2月1日

Freight operations were discontinued.

Machine translation — show Japanese original

貨物営業廃止。

1987 4月1日

With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East).

Machine translation — show Japanese original

国鉄分割民営化に伴い、東日本旅客鉄道(JR東日本)の駅となる。

1993 4月27日

Automatic ticket gates were installed and put into service.

Machine translation — show Japanese original

自動改札機を設置し、供用開始。

1994 8月23日

The escalator inside the ticket gate began operation.

Machine translation — show Japanese original

改札内のエスカレーター供用開始。

1995 3月

The south entrance escalator was installed.

Machine translation — show Japanese original

南口エスカレーター設置。

2001 11月18日

The IC card "Suica" becomes available for use.

Machine translation — show Japanese original

ICカード「Suica」の利用が可能となる。

2006 5月27日

The operation of Midori-no-Madoguchi was terminated and automatic ticket vending machines for reserved-seat tickets were installed.

Machine translation — show Japanese original

みどりの窓口の営業を終了し、指定席券売機を設置。

2007 4月

The north entrance temporary rotary began operation.

Machine translation — show Japanese original

北口仮設ロータリーが供用開始。

2010 10月25日

Elevator service inside the ticket gates began.

Machine translation — show Japanese original

改札内のエレベータ供用開始。

2013 4月1日

The elevator at the south entrance was put into service.

Machine translation — show Japanese original

南口のエレベーター供用開始。

2015 3月1日

Early morning unmanned operation.

Machine translation — show Japanese original

早朝無人化。

2017

The north entrance escalator began operation.

Machine translation — show Japanese original

北口エスカレーター供用開始。

2022 1月31日

The use of Smart Home Door was started.

Machine translation — show Japanese original

スマートホームドアの使用を開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kita-Kashiwa Station FAQ

What train lines connect at Kita-Kashiwa Station?

Kita-Kashiwa Station is served by .