大森

Omori Station

日本語で読む

Omori is a railway station in Tokyo.

Omori Station (大森駅) is a ground-level station with a concourse in Ōta, Tokyo. East Japan Railway Company runs it on the Keihin–Tōhoku Line. It opened on 12 June 1876.

History

Omori Station (大森駅) opened on 12 June 1876 as a government railway station, for passengers only. In 1877 Edward S. Morse, travelling by train from Yokohama to Shimbashi, spotted the Omori shell mound (大森貝塚) from the left-hand window just after the train left the station. Double track was laid between Omori and Kawasaki on 1 March 1879, and between Shinagawa and Omori on 14 November 1880. Freight handling began on 1 April 1898. On 1 February 1901 the Keihin Electric Railway opened Omori-teishajo-mae Station when its line to Kawasaki opened. The station was later renamed Omori Station. On 8 May 1904 the section from Omori-teishajo-mae to Kaigan (now Omori Kaigan) became the Keihin Electric Railway's Omori Branch.

In February 1913 the Sanno-guchi ticket gate opened, now the west exit. On 20 December 1914 the Keihin Line, the forerunner of the Keihin–Tohoku Line, began running. In 1919 the Sanno-guchi gate was expanded. In 1930 a shared bus route between Omori Station and Ikegami opened. On 8 March 1937 the Keihin Electric Railway's Omori Branch closed. On 10 December 1959 the north exit opened. On 1 October 1974 freight handling ended.

In September 1977, to mark the centenary of the discovery of the Omori shell mound, a stone monument reading 'Birthplace of Japanese Archaeology' was put up on the platform. In July 1982 reconstruction of the station building began, and the present building was completed in July 1984. On 14 September 1984 the Omori Primo station building opened. It is now called Atre Omori. In April 1985 a footbridge linking the north gate with Minami-Oi in Shinagawa Ward was completed, as a joint project of Shinagawa and Ota wards. On 1 November 1986 luggage handling ended. On 1 April 1987, when national railways were split up, the station passed to JR East.

On 10 March 1989 the north stairs were widened. A work-vehicle siding on the former luggage platform was removed to extend the platform to the south. On 20 March 1990 a travel centre opened. On 20 September 1991 automatic ticket gates came into use at the central gate, and on 27 September 1991 at the north gate. On 16 March 1994 an up escalator from the platform to the central gate was installed. In July 2001 the first Omori Dream Concert was held in the central gate concourse. Suica could be used from 18 November 2001. On 13 December 2002 a down escalator from the central gate to the platform was installed. On 7 February 2003 a lift linking the platforms to the central gate was installed. On 15 November 2005 Omori Primo was renewed and renamed Atre Omori. On 3 July 2007 Atre Omori 2 was renewed, and on 9 October 2008 Atre Omori was renewed again.

On 31 March 2018 the View Plaza closed. On 23 September 2019 platform doors came into use. On 31 October 2021 the Midori no Madoguchi ticket office closed. On 11 November 2023 a customer support call system was introduced at the north gate. On 1 October 2025 the Eki-net Q Ticket service started.

See all 39 dated events in the Data view →

Written by an AI from this station's own sourced facts (the dated events in the Data view), nothing else, and checked by a program for dates and numbers that are not in those facts. It can still be wrong. Found a mistake? . Adapted from Japanese Wikipedia, CC BY-SA 4.0; this text is shared under the same licence.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
39 Events
1876 6月12日

A station on the government railway opened, operating as a passenger station for passenger business only.

Machine translation — show Japanese original

官設鉄道の駅が開業。旅客営業のみの旅客駅。

1877

While traveling by up train from Yokohama to Shinbashi, Edward S. Morse discovered the Ōmori Shell Mound through the left train window immediately after departing this station.

Machine translation — show Japanese original

上り列車で横浜から新橋へ移動中のエドワード・S・モースが当駅発車直後の左車窓に大森貝塚を発見。

1879 3月1日

The section between Ōmori and Kawasaki was doubled-tracked.

Machine translation — show Japanese original

大森 - 川崎間が複線化。

1880 11月14日

The Shinagawa - Ōmori section was doubled-tracked.

Machine translation — show Japanese original

品川 - 大森間が複線化。

1898 4月1日

Freight handling began.

Machine translation — show Japanese original

貨物取扱開始。

1901 2月1日

The Omori-Teishajo-mae Station opened simultaneously with the opening of the Keihin Electric Railway line from Omori-Teishajo-mae to Kawasaki, and was later renamed Omori Station.

Machine translation — show Japanese original

京浜電気鉄道(現在の京浜急行電鉄)大森停車場前 - 川崎(後の六郷橋)間開通と同時に大森停車場前駅が開業。後に大森駅へ改称する。

1904 5月8日

The section between Omori Station and Kaigan (now Omori Kaigan) became the Omori Branch Line of Keihin Electric Railway.

Machine translation — show Japanese original

大森停車場前 - 海岸(現・大森海岸)間が京浜電気鉄道大森支線となる。

1913 2月

The Sanno-guchi ticket gate, now known as the West gate, was opened.

Machine translation — show Japanese original

山王口改札(現・西口)開設。

1914 12月20日

The Keihin Line, the predecessor to the Keihin-Tohoku Line, began operation.

Machine translation — show Japanese original

京浜線(京浜東北線の前身)運行開始。

1919

The Sanno-guchi ticket gate, now known as the West gate, was expanded.

Machine translation — show Japanese original

山王口改札(現・西口)拡張。

1930

A shared bus service opened between Ōmori Station and Ikegami Station.

Machine translation — show Japanese original

大森駅 - 池上駅間に乗合バス開通。

1930 3月15日

The through line is used by all passenger trains.

Machine translation — show Japanese original

列車線は全旅客列車が通過となる。

1937 3月8日

The Keihin Electric Railway Omori branch line was abolished.

Machine translation — show Japanese original

京浜電気鉄道大森支線が廃止。

1959 12月10日

The north entrance ticket gate was opened.

Machine translation — show Japanese original

北口改札開設。

1974 10月1日

Freight handling was abolished.

Machine translation — show Japanese original

貨物取扱廃止。

1977 9月

A monument marking the "Birthplace of Japanese Archaeology" was erected on the station platform to commemorate the 100th anniversary of the discovery and excavation of the Ōmori Shell Mound.

Machine translation — show Japanese original

大森貝塚発見発掘100周年を記念し、駅ホームに「日本考古学発祥の地」碑が建立される。

1982 7月

The station building reconstruction work commenced.

Machine translation — show Japanese original

駅舎改築工事着工。

1984 7月

The current station building was completed.

Machine translation — show Japanese original

現駅舎完成。

1984 9月14日

The station building "Omori Primo" (now "Atre Omori") opened.

Machine translation — show Japanese original

駅ビル「大森プリモ」(現在の「アトレ大森」)開業。

1985 4月

The joint project of Minato-ku and Ota-ku, the "Omori Station Pedestrian Overpass" (a free passage leading east from the north gate ticket gate towards Minami-Oi in Minato-ku), was completed.

Machine translation — show Japanese original

品川区と大田区の共同事業「大森駅歩道橋」(北口改札から東側〈品川区南大井方面〉へ下りる自由通路)完成。

1986 11月1日

Freight handling was abolished.

Machine translation — show Japanese original

荷物の取り扱いを廃止。

1987 4月1日

With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East).

Machine translation — show Japanese original

国鉄分割民営化に伴い、東日本旅客鉄道(JR東日本)の駅となる。

1989 3月10日

In 1989, the expansion of the north entrance staircase was completed, for which the maintenance vehicle storage track, formerly the freight platform, was removed to allow the platform to be extended southward.

Machine translation — show Japanese original

(平成元年):北口階段拡幅完成(ホームを南寄りに延伸するため、工事車両留置線〈荷物ホーム跡〉を撤去)。

1990 3月20日

The Travel Center opened.

Machine translation — show Japanese original

旅行センターオープン。

1991 9月20日

Automatic ticket gates were installed at the central ticket gate and began operation.

Machine translation — show Japanese original

中央改札に自動改札機を設置し、使用開始。

1991 9月27日

Automatic ticket gates were installed at the north ticket gate and began operation.

Machine translation — show Japanese original

北改札に自動改札機を設置し、使用開始。

1994 3月16日

An up escalator from the platform to the Central Gate ticket gate was installed.

Machine translation — show Japanese original

ホームから中央口改札への上りエスカレータ設置。

2001 7月

The 1st "Omori Yume Concert" was held in the Central Gate Concourse.

Machine translation — show Japanese original

中央口コンコースにて第1回「大森夢コンサート」開催。

2001 11月18日

The IC card "Suica" becomes available for use.

Machine translation — show Japanese original

ICカード「Suica」の利用が可能となる。

2002 12月13日

An down escalator connecting the Central Gate ticket gate to the platform was installed.

Machine translation — show Japanese original

中央口改札からホームを連絡する下りエスカレーター設置。

2003 2月7日

Elevators were installed to connect the platforms and the central ticket gates.

Machine translation — show Japanese original

ホームと中央改札口を連絡するエレベーター設置。

2005 11月15日

The station building "Omoriplimo" was renovated and renamed "Atre Omori".

Machine translation — show Japanese original

駅ビル「大森プリモ」のリニューアル完成。「アトレ大森」に改称。

2007 7月3日

The station building "Atre Oomori 2" was renovated.

Machine translation — show Japanese original

駅ビル「アトレ大森2」がリニューアル。

2008 10月9日

The station building "Atre Oomori" was renovated.

Machine translation — show Japanese original

駅ビル「アトレ大森」がリニューアル。

2018 3月31日

Byū Plaza ended its operations.

Machine translation — show Japanese original

びゅうプラザの営業を終了。

2019 9月23日

In 2019, the use of platform doors was started.

Machine translation — show Japanese original

(令和元年):ホームドアの使用を開始。

2021 10月31日

The Midori no Madoguchi service ended operations.

Machine translation — show Japanese original

みどりの窓口の営業を終了。

2023 11月11日

The customer support call system was introduced at the north exit ticket gate.

Machine translation — show Japanese original

北口改札にお客さまサポートコールシステムを導入。

2025 10月1日

The Ekinet Q-Chike service was started.

Machine translation — show Japanese original

えきねっとQチケのサービスを開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Nearby landmarks not documented yet
Accessibility
Step-free access and facilities not documented yet

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (KEIHIN–TŌHOKU LINE)
1 Down
蒲田 · 川崎 · 横浜
2 Up
品川 · 東京 · 上野
↕ Platforms 1, 2 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Omori Station FAQ

What train lines connect at Omori Station?

Omori Station is served by Keihin–Tōhoku Line.