大井町

Oimachi Station

Live Network Status Active

Oimachi is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
34 Events
1901 3月15日

The Japanese National Railways opened Ōi Junction on the Tōkaidō Main Line.

Machine translation — show Japanese original

国鉄東海道本線に大井聯絡所を開設。

1901 8月1日

The Yamanote Line branch line between Ōi Junction and Ōsaki Station opened.

Machine translation — show Japanese original

大井聯絡所 - 大崎駅間の山手線支線が開通する。

1914 12月20日

With the start of operation on the Keihin Line, the precursor to the Keihin-Tohoku Line, Oi-tsukaku-sho was elevated to a station and Oimachi Station opened as a passenger station.

Machine translation — show Japanese original

京浜線(京浜東北線の前身)運行開始に伴い、大井聯絡所を駅に格上げし大井町駅が開業する(旅客駅)。

1916 4月16日

The branch line of the Yamanote Line between Ōsaki Station and Ōimachi Station was abolished.

Machine translation — show Japanese original

大崎駅 - 大井町駅間の山手線支線を廃止する。

1927 7月6日

The section between Ōimachi and Ōokayama on the Ōimachi Line of Meguro-Kamata Electric Railway, now Tōkyū Corporation, opens.

Machine translation — show Japanese original

目黒蒲田電鉄(現・東急電鉄)大井町線大井町 - 大岡山間が開通する。

1942

The station building of Tokyo-Yokohama Electric Railway, now Tokyu Corporation, was rebuilt, and a platform for exiting passengers was also installed.

Machine translation — show Japanese original

東京横浜電鉄(現・東急電鉄)の駅舎を改築。同時に降車ホームを設置する。

1957 7月29日

The Japanese National Railways west entrance station building was rebuilt.

Machine translation — show Japanese original

国鉄西口駅舎が改築される。

1957 9月15日

The Yamanote Line and Keihin-Tohoku Line platforms were extended towards Shinagawa Station, and a connecting overpass was completed to link the Japanese National Railways station with the Tokyo Kyuko Electric Railway, now Tokyu Corporation, station.

Machine translation — show Japanese original

京浜東北線ホームが品川駅方面へ延長され、国鉄の駅と東京急行電鉄(現・東急電鉄)の駅を結ぶ連絡跨線橋が完成する。

1972 3月15日

The handling of luggage at Japanese National Railways stations was abolished.

Machine translation — show Japanese original

国鉄駅での荷物の取扱を廃止する。

1987 4月1日

With the privatization of Japanese National Railways, the station became a station of East Japan Railway Company (JR East).

Machine translation — show Japanese original

国鉄分割民営化に伴い、国鉄の駅は東日本旅客鉄道(JR東日本)の駅となる。

1990 7月5日

The construction of JR East's station building commenced.

Machine translation — show Japanese original

JR東日本の駅ビル着工。

1991 8月31日

JR East stations began installing and using automatic ticket gates.

Machine translation — show Japanese original

JR東日本の駅で自動改札機を設置し、使用開始。

1993 3月11日

The station building "Atre Oimachi" was completed and the east-west free passage was opened to service.

Machine translation — show Japanese original

駅ビル「アトレ大井町」が完成。東西自由通路の供用開始。

2001 11月18日

IC card "Suica" becomes available at JR East stations.

Machine translation — show Japanese original

JR東日本の駅でICカード「Suica」が利用可能となる。

2002 11月25日

JR East began using the new East Exit station building.

Machine translation — show Japanese original

JR東日本の東口新駅舎の使用を開始する。

2002 12月1日

A Tokyo Waterfront Area Rapid Transit Rinkai Line station opened, with Rinkai Line stations becoming usable with Suica.

Machine translation — show Japanese original

東京臨海高速鉄道りんかい線の駅が開業する。りんかい線の駅で「Suica」の利用が可能となる。

2005 3月6日

The platforms on the Tōkyū Ōimachi Line were expanded.

Machine translation — show Japanese original

東急大井町線のホームが拡幅される。

2007 3月18日

IC card "PASMO" became available for use on Tokyu Corporation.

Machine translation — show Japanese original

東急電鉄でICカード「PASMO」の利用が可能となる。

2008 3月20日

The station building "Atre Oimachi" was renovated.

Machine translation — show Japanese original

駅ビル「アトレ大井町」がリニューアル。

2011 3月3日

The station building and station complex "Atre Oimachi 2" at the east exit of JR East's Oimachi Station opened.

Machine translation — show Japanese original

JR東日本の東口新駅舎に駅ビル「アトレ大井町2」がオープン。

2012 3月3日

The use of platform doors began on the Tokyu Oimachi Line platforms.

Machine translation — show Japanese original

東急大井町線ホームでホームドアの使用を開始。

2018 2月14日

The use of platform doors began on the Keihin-Tohoku Line platforms.

Machine translation — show Japanese original

京浜東北線ホームでホームドアの使用を開始。

2018 3月31日

Byū Plaza ended its operations.

Machine translation — show Japanese original

びゅうプラザの営業を終了。

2019 12月1日

In 2019, JR East stations were outsourced.

Machine translation — show Japanese original

(令和元年):JR東日本の駅が業務委託化。

2020 2月16日

The use of platform doors began on Rinkai Line Track 2.

Machine translation — show Japanese original

りんかい線2番線でホームドアの使用を開始。

2020 2月24日

The Rinkai Line began using platform doors on Track 1.

Machine translation — show Japanese original

りんかい線1番線でホームドアの使用を開始。

2021 4月30日

The sales of commuter passes at Tokyu Corporation's ticket counters ended.

Machine translation — show Japanese original

東急電鉄の定期券売り場の営業を終了。

2022 10月31日

The Midori no Madoguchi service ended operations.

Machine translation — show Japanese original

みどりの窓口の営業を終了。

2022 11月1日

Introduced ticket vending machines with voice guidance.

Machine translation — show Japanese original

話せる指定席券売機を導入。

2024 8月

In mid-month, the platform doors for the first three cars on the Keihin-Tohoku Line and Omiya-bound trains were removed in advance of the upcoming track switching work.

Machine translation — show Japanese original

中旬:後述の線路切換工事の実施に先行し、京浜東北線・大宮方面の前寄り3両(8 - 10号車)のホームドアを撤去。

2024 11月17日

The Keihin-Tohoku Line was suspended between Kamata Station and Shinagawa Station from the first train to around 16:30 due to track switching work to widen part of the Keihin-Tohoku Line platform.

Machine translation — show Japanese original

京浜東北線ホームの一部を拡幅する線路切換工事の実施に伴い、京浜東北線・蒲田駅 - 品川駅間が初電 - 16時30分ごろまで運休。

2025 8月

Sliding doors were reinstalled on the front three cars (cars 8-10) bound for Omiya on the Keihin-Tohoku Line.

Machine translation — show Japanese original

ごろ:京浜東北線・大宮方面の前寄り3両(8 - 10号車)にホームドアを再設置。

2025 10月1日

JR East started the Eki-net Q-Chike service.

Machine translation — show Japanese original

JR東日本でえきねっとQチケのサービスを開始。

2026 3月28日

OIMACHI TRACKS opened, and JR East's new ticket gate, the Tracks Gate, was established in conjunction with this.

Machine translation — show Japanese original

OIMACHI TRACKSが開業。これに伴いJR東日本の新改札口「トラックス口」が開設される。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Departure Melodies
アンダー・ザ・シー リトル・マーメイド
OM Tokyu Oimachi Line 全ホーム共通(下り 溝の口方面)
ハクナ・マタタ ライオンキング
OM Tokyu Oimachi Line 全ホーム共通(下り 溝の口方面)
Cielo Estrellado
Water Crown
美女と野獣
ビ アワ ゲスト(おもてなし)
リトル・マーメイド
パート・オブ・ユア・ワールド
キャッツ
メモリー
Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (KEIHIN–TŌHOKU LINE)
1 Up
東京 · 上野 · 大宮
2 Down
蒲田 · 横浜 · 大船
Platforms 1, 2 serve this line

Transfers from this platform

TWR Rinkai Line Tokyo Waterfront Railway
5 min Moderate
OM Tokyu Oimachi Line Tokyu
5 min Moderate
PLATFORM LAYOUT (TWR RINKAI LINE)
1 Down
2 Up
Platforms 1, 2 serve this line

Transfers from this platform

Keihin–Tōhoku Line JR-East
5 min Moderate
OM Tokyu Oimachi Line Tokyu
2 min Easy
PLATFORM LAYOUT (OM TOKYU OIMACHI LINE)
1・2
自由が丘 · 二子玉川 · 溝の口
Platforms 1, 2 serve this line

Transfers from this platform

Keihin–Tōhoku Line JR-East
5 min Moderate
TWR Rinkai Line Tokyo Waterfront Railway
2 min Easy

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Oimachi Station FAQ

What train lines connect at Oimachi Station?

Oimachi Station is served by Keihin–Tōhoku Line, TWR Rinkai Line, OM Tokyu Oimachi Line.