太田

Ota Station

日本語で読む

Ota is a railway station in Tokyo.

Ota Station (太田駅) in Ota, Gunma, is run by Tobu Railway and serves the Tobu Isesaki Line. It opened on 17 February 1909.

History

The station opened on 17 February 1909 when the Tobu Isesaki Line opened between Ashikagamachi Station (足利町駅, now Ashikaga-shi Station) and this station. On 27 March 1910 the line opened from here to Shin-Isesaki. On 19 March 1913 the Kiryu Line opened from here to Aioi. The Tatebayashi to Isesaki section was electrified on 1 October 1927, and the Kiryu Line from here to Aioi on 1 March 1928.

On 16 November 1934 Emperor Showa toured the prefecture after the army maneuvers, and a special train ran between Ashikaga-shi and Ota and between Ota and Isesaki. A new station building was completed in April 1941. The Koizumi Line opened from here to Koizumi-machi on 1 June 1941, and was electrified from here to Nishi-Koizumi on 16 May 1943. An air raid burned the station building on 4 April 1945.

A station building was completed in February 1954, and it was rebuilt several times after that. A south exit opened in December 1966. On 18 November 1999 the Koizumi Line platform at Ota was elevated, and nearby level crossings closed. On 25 November 2004 the Tobu Isesaki and Kiryu platforms were raised, many level crossings closed, and automatic ticket gates were introduced. A new first platform was added on the north side in 2006. A north-south free passage opened in 2007, which completed the grade-separation project.

The north square was completed on 18 December 2009. Station numbering began on 17 March 2012. On 21 April 2017 a timetable change moved some train departures, and the platforms on the Isesaki side stopped being used.

See all 19 dated events in the Data view →

Written by an AI from this station's own sourced facts (the dated events in the Data view), nothing else, and checked by a program for dates and numbers that are not in those facts. It can still be wrong. Found a mistake? . Adapted from Japanese Wikipedia, CC BY-SA 4.0; this text is shared under the same licence.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
19 Events
1909 2月17日

The Ashio Line opened with the completion of the section between Ashikaga-machi Station, now Ashikaga City Station, and this station.

Machine translation — show Japanese original

伊勢崎線の足利町駅(現・足利市駅) - 当駅間が開通し、開業。

1910 3月27日

The section between the current station and Shin-Isesaki Station on the Isesaki Line opened.

Machine translation — show Japanese original

伊勢崎線の当駅 - 新伊勢崎駅間開業。

1913 3月19日

The section of the Kiryū Line between the current station and Aioi Station opened.

Machine translation — show Japanese original

桐生線の当駅 - 相老駅間が開通。

1927 10月1日

The Tatebayashi - Isesaki section of the Isesaki Line was electrified.

Machine translation — show Japanese original

伊勢崎線の館林駅 - 伊勢崎駅間電化。

1928 3月1日

The section of the Kiryū Line between the current station and Aioi Station was electrified.

Machine translation — show Japanese original

桐生線の当駅 - 相老駅間が電化。

1934 11月16日

After the completion of the Imperial Japanese Army's special large-scale maneuvers in the prefecture, the Showa Emperor toured the prefecture, with an imperial train operating between Ashikaga City Station and Ota Station, and between Ota Station and Isesaki Station.

Machine translation — show Japanese original

県内で行われた陸軍特別大演習終了後に昭和天皇が県内を巡幸。足利市駅 - 太田駅、太田駅 - 伊勢崎駅間でお召し列車が運行。

1941 4月

The new station building was completed.

Machine translation — show Japanese original

新駅舎竣工。

1941 6月1日

The section of the Koizumi Line between the current station and Koizumi Town Station opened.

Machine translation — show Japanese original

小泉線の当駅 - 小泉町駅間が開通。

1943 5月16日

The Koizumi Line was electrified between the current station and Nishikoizumi.

Machine translation — show Japanese original

小泉線の当駅 - 西小泉間電化。

1945 4月4日

The station building was destroyed in an air raid.

Machine translation — show Japanese original

空襲により駅舎が焼失。

1954 2月

The station building was completed and subsequently underwent repeated expansions and renovations.

Machine translation — show Japanese original

駅舎が完成。その後も増改築が繰り返される。

1966 12月

The south entrance was opened.

Machine translation — show Japanese original

南口が開設。

1999 11月18日

A 1.5 km section of the Koizumi Line, including the platform at Ota Station, was elevated, and three level crossings around the station were abolished.

Machine translation — show Japanese original

小泉線の太田駅ホームを含む延長1.5 kmが高架化され、駅周辺の3踏切が廃止される。

2004 11月25日

The Isesaki Line and Ryomo Line platforms were elevated and expanded to 3 platforms with 5 tracks, eliminating 14 level crossings, and automatic ticket gates were introduced, while the station's west-side National Route 407, which had been closed since May due to overpass demolition work, was reopened to two-way traffic on the 26th of the same month.

Machine translation — show Japanese original

伊勢崎線・桐生線ホームが高架化され、3面5線化。踏切14か所が廃止される。自動改札機を導入。陸橋解体工事のため同年5月からは駅西側の国道407号が通行止めになっていたが、同月26日6時に暫定2車線で再開通する。

2006

A new platform for Track 1 was established on the north side of the platform for Track 2, and the station was expanded to six platforms with three island platforms, and new platforms for Tracks 7-10 were added on the downstream side of the Isesaki Line platform.

Machine translation — show Japanese original

2番線ホームの北側に1番線ホームを新設し、3面6線化。伊勢崎線ホームの下り方に7 - 10番線ホームを新設。

2007

The North-South Free Passage was opened to traffic, marking the completion of the continuous elevated crossing project that had been underway since 1997 at a total construction cost of 28.9 billion yen.

Machine translation — show Japanese original

南北自由通路が供用開始。これにより、総工費289億円を投じて1997年以来進められてきた連続立体交差事業は完了となる。

2009 12月18日

The north exit station plaza of Ōta Station was completed.

Machine translation — show Japanese original

太田駅北口駅前広場が竣工。

2012 3月17日

Station numbering was introduced (TI 18).

Machine translation — show Japanese original

駅ナンバリングが導入(TI 18)。

2017 4月21日

Due to the timetable revision, the use of platforms 7-10 on the Isesaki side was discontinued.

Machine translation — show Japanese original

ダイヤ改正に伴う着発番線の変更により、伊勢崎寄りの7 - 10番線ホームの使用を停止。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Nearby landmarks not documented yet
Accessibility
Step-free access and facilities not documented yet

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (TI TOBU ISESAKI LINE)
1 Up
館林 · 久喜 · 東武スカイツリーライン 北千住
4
伊勢崎
↕ Platforms 1, 4 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Ota Station FAQ

What train lines connect at Ota Station?

Ota Station is served by TI Tobu Isesaki Line.