新松戸

Shim-Matsudo Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
10 Events
1973 4月1日

The station opened as a Japanese National Railways (JNR) station with the simultaneous opening of the Jōban Line and the Musashino Line, and was at the time the terminus of the Musashino Line.

Machine translation — show Japanese original

日本国有鉄道(国鉄)の駅として、常磐線・武蔵野線同時に開業。当時は武蔵野線の終着駅であった。

1978 10月2日

The Musashino Line, which was planned as the Kogane Line, was extended and opened to Nishi-Funabashi Station, with this station becoming an intermediate stop.

Machine translation — show Japanese original

武蔵野線(計画時は小金線)が西船橋駅まで延伸開業。途中駅となる。

1982 1月10日

In 1982, the Sobu Nagareyama Electric Railway's Sakai Station was relocated to its current location across the road, becoming a transfer station.

Machine translation — show Japanese original

|1982]]年:総武流山電鉄(現・流鉄)幸谷駅が道路向かいの現在地に移転、乗換駅となる。

1987 4月1日

With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East).

Machine translation — show Japanese original

国鉄分割民営化に伴い、東日本旅客鉄道(JR東日本)の駅となる。

1992 7月14日

Automatic ticket gates were installed and put into use.

Machine translation — show Japanese original

自動改札機を設置し、使用を開始する。

2001 11月18日

The IC card "Suica" becomes available for use.

Machine translation — show Japanese original

ICカード「Suica」の利用が可能となる。

2002 2月

In 2002, an "Akari no Box" was installed between the up and down lines on the road in front of the station under the Musashino Line viaduct.

Machine translation — show Japanese original

|2002]]年:「赤い鳥居(あかりのボックス)」を武蔵野線高架下の駅前道路の上下線間に設置。

2010

In 2010, barrier-free construction at the station was completed, including the installation of elevators connecting the Joban Line platform to each Musashino Line platform and the ticket gates, the addition of transfer escalators, and the installation of multi-function toilets.

Machine translation — show Japanese original

|2010]]年:駅バリアフリー工事完成。常磐線行線ホームから武蔵野線各ホームへのエレベーター設置(エレベーターは改札階にも接続)、乗換用エスカレーター増設、多機能トイレ設置。

2018 2月26日

In 2018, the renovation work on the public toilet in front of the station was completed.

Machine translation — show Japanese original

|2018]]年:駅前公衆トイレ改良工事終了。

2021 12月19日

The use of platform doors began on platforms 1 and 2, the Jōban Local Line platforms.

Machine translation — show Japanese original

1・2番線(常磐緩行線ホーム)でホームドアの使用を開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (MUSASHINO LINE)
3 Up
南浦和 · 武蔵浦和 · 府中本町
4 Down
西船橋 · 舞浜 · 東京
Platforms 3, 4 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Shim-Matsudo Station FAQ

What train lines connect at Shim-Matsudo Station?

Shim-Matsudo Station is served by Musashino Line.