祖師ヶ谷大蔵

Soshigaya-Okura Station

日本語で読む

Soshigaya-Ōkura Station (祖師ヶ谷大蔵駅) is an elevated station in Setagaya, Tokyo. Odakyu Electric Railway runs it on the Odakyu Odawara Line. It opened on 1 April 1927.

History

Soshigaya-Ōkura Station opened on 1 April 1927. On 1 September 1937, it became a stop for through trains to Katase-Enoshima, although through trains bound for Odawara passed it. In September 1948, the Sakura semi-express was introduced, and the station became a stop for it. In February 1950, the section express was abolished.

In December 1994, work started to elevate the multi-track line between Seijō Gakuen-mae and Umegaoka. In April 1998, the design of the outside of the new station building was decided. On 28 March 1999, the down line was elevated. On 23 April 2000, the up line was elevated, and the current station building opened. On 16 December 2001, the up platform was moved to a permanent platform. On 23 May 2004, the up express track came into use. On 26 September 2004, the down express track came into use, and the multi-track work was completed. On 11 December 2004, the section semi-express was established, and the station became a stop for it.

On 19 December 2005, the Setagaya community bus route Setagaya Kurin began running, and a new bus stop was set up at the north exit, at the entrance of the Ultraman shopping street. On 19 March 2006, to mark the anniversary of the Ultraman shopping street near the station, Odakyu's first approach melody was introduced. The up platform plays the Ultraman song, and the down platform plays the Ultra Seven song. On 1 March 2010, a bus stop name was changed to Sanno Elementary School, and a condominium was built on the former site. On 16 May 2010, a bus stop was set up at the south exit, and Tokyu Bus route buses began entering the front of the station. Before that, the front was too narrow, so buses turned around one stop earlier at Soshigaya-Ōkura. The same day, that stop was renamed the Soshigaya Turnaround Point. In January 2014, station numbering was introduced. On 26 March 2016, the section semi-express was abolished, and only local trains stopped again. On 17 March 2018, the station became a stop for semi-express trains, and Tokyo Metro Chiyoda Line through trains began stopping here.

On 17 December 2025, platform doors began operating.

See all 20 dated events in the Data view →

Written by an AI from this station's own sourced facts (the dated events in the Data view), nothing else, and checked by a program for dates and numbers that are not in those facts. It can still be wrong. Found a mistake? . Adapted from Japanese Wikipedia, CC BY-SA 4.0; this text is shared under the same licence.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
20 Events
1927 4月1日

Opened.

Machine translation — show Japanese original

開設。

1937 9月1日

It becomes a stopping station for the "Direct" train bound for Katase-Enoshima Station (the "Direct" train bound for Odawara passes through).

Machine translation — show Japanese original

片瀬江ノ島駅行「直通」の停車駅となる(小田原方面行「直通」は通過)。

1948 9月

The Sakura semi-express was established and it became a stop.

Machine translation — show Japanese original

桜準急新設、停車駅となる。

1950 2月

The Section Express service was abolished.

Machine translation — show Japanese original

区間急行廃止。

1994 12月

Construction began on the elevated quadruple-tracking project between Seijōgakuen-mae Station and Umegaoka Station.

Machine translation — show Japanese original

成城学園前駅 - 梅ヶ丘駅間高架複々線化工事着工。

1998 4月16日

The exterior design of the new station building was determined as part of the elevated quadruple-tracking project.

Machine translation — show Japanese original

高架複々線化事業に伴う新駅舎外観デザイン決定。

1999 3月28日

The down line was elevated.

Machine translation — show Japanese original

下り線高架化。

2000 4月23日

The up line was elevated and operated with temporary platforms, and the current station building was opened for service.

Machine translation — show Japanese original

上り線高架化(仮設ホームで営業)。現在の駅舎供用開始。

2001 12月16日

The up-line platform was relocated to the main platform.

Machine translation — show Japanese original

上り線ホームを本設ホームへ移設。

2004 5月23日

The upbound express line began operation, ending the use of the downbound express line by upbound priority trains.

Machine translation — show Japanese original

上り急行線使用開始(上り優等列車の下り急行線用地線路利用終了)。

2004 9月26日

The down express line began operation, completing the quadruple-tracking.

Machine translation — show Japanese original

下り急行線使用開始(複々線化完成)。

2004 12月11日

The section semi-express service was introduced, and it became a stopping station.

Machine translation — show Japanese original

区間準急新設、停車駅となる。

2005 12月19日

With the start of operation of the Setagaya Ward Community Bus "Setagaya Kururin" Chozushi-Narise Loop Route, a new bus stop was established at the north exit, the entrance to the Ultraman shopping street.

Machine translation — show Japanese original

世田谷区コミュニティバス「祖師谷・成城地域循環路線(せたがやくるりん)運行開始に伴い 、北口(ウルトラマン商店街の入口)にバス乗り場が新設された。

2006 3月19日

To commemorate the first anniversary of the Ultraman shopping street near the station, Odakyu introduced its first arrival melody, with the uphill platform playing "The Ultraman Song" and the downhill platform playing "The Ultraseven Song".

Machine translation — show Japanese original

当駅周辺にあるウルトラマン商店街が生誕1周年を記念し、小田急初となる接近メロディ導入。曲は上りホームが「ウルトラマンの歌」、下りホームが「ウルトラセブンの歌」である。

2010 3月1日

The discontinued bus stop name was changed to "San'no Elementary School", and a condominium was built on the site.

Machine translation — show Japanese original

廃止されたバス停名を「山野小学校」へ改称。跡地にはマンション が建設された(詳しくは東急バス弦巻営業所 と東急バス瀬田営業所 の記事も参照)。

2010 5月16日

A new bus stop was established at the south entrance, and Tokyu Bus's route buses began entering the station front, whereas previously they had been turning back at Tsunashima Daitsu due to the narrow station front, and on the same day Tsunashima Daitsu was renamed Tsunashima-kai Fold.

Machine translation — show Japanese original

南口にバス停留所新設、東急バスの路線バスが駅前へ乗入開始。 それまでは駅前が狭隘なため、1つ手前の「祖師谷大蔵」で折返していた。同日、「祖師谷大蔵」は「祖師ヶ谷折返所」に改称された。なお、「祖師ヶ谷折返所」は2010年

2014 1月

Station numbering was introduced and began to be used at OH 13.

Machine translation — show Japanese original

OH 13の駅ナンバリング導入、使用開始。

2016 3月26日

The sectional semi-express service was abolished, and it once again stopped only at local stations.

Machine translation — show Japanese original

区間準急廃止、再度各駅停車のみ停車となる。

2018 3月17日

It became a stop for semi-express trains and simultaneously started serving Tokyo Metro Chiyoda Line through trains, including semi-express and local trains.

Machine translation — show Japanese original

準急の停車駅となり、同時に東京メトロ千代田線直通列車(準急・各駅停車)停車開始。

2025 12月17日

Platform doors began to be used.

Machine translation — show Japanese original

ホームドアの使用を開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Departure Melodies
ウルトラセブンの歌
Odakyu Odawara Line (OH) 1番ホーム since 2006年3月18日

駅の近くに円谷プロダクションがあることから、「ウルトラマンまちづくり」の一環として、同作品のテーマ曲をオルゴール調にアレンジした接近メロディを採用。

ウルトラマンの歌
Odakyu Odawara Line (OH) 2番ホーム since 2006年3月18日

駅の近くに円谷プロダクションがあることから、「ウルトラマンまちづくり」の一環として、同作品のテーマ曲をオルゴール調にアレンジした接近メロディを採用。

Landmarks
Nearby landmarks not documented yet
Accessibility
Step-free access and facilities not documented yet

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (ODAKYU ODAWARA LINE (OH))
Platform assignment not documented for this line yet

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Soshigaya-Okura Station FAQ

What train lines connect at Soshigaya-Okura Station?

Soshigaya-Okura Station is served by Odakyu Odawara Line (OH).