History, melodies, surroundings
Station History & Timeline
39 Events
1883

At this time, the station was not located in the center of the former Urawa-juku, but rather on the southeastern outskirts of the post town, near the Saitama Prefectural Government building.

Machine translation — show Japanese original

この際、当駅は旧浦和宿の中心ではなく、埼玉県庁に近い宿場町南東側の外れに設けられた。

1883 7月28日

The station opened when Nippon Railway opened the Ueno Station - Kumagaya Station section, initially as a ground-level station with 2 platforms and 3 tracks.

Machine translation — show Japanese original

日本鉄道が上野駅 - 熊谷駅間を開業した際に開業。開業から間もない頃は2面3線の地上駅であった。

1890 12月

The Akabane - Ōmiya section was double-tracked.

Machine translation — show Japanese original

赤羽駅 - 大宮駅間複線化。

1906 11月1日

It was nationalized under the Railway Nationalization Act.

Machine translation — show Japanese original

鉄道国有法により国有化。

1909 10月12日

The line came under the Tōhoku Main Line with the designation of line names.

Machine translation — show Japanese original

線路名称制定により東北本線の所属となる。

1916 7月

A bus service to Hatogaya started operation, although it is no longer in operation today.

Machine translation — show Japanese original

鳩ヶ谷方面への乗合バスが運行開始(現在は運行していない)。

1921 8月

Bus services to Shiki and Ōji commenced and are still operating.

Machine translation — show Japanese original

志木・大門方面へのバスが運行開始(現在も運行)。

1929

The second station building was opened for use.

Machine translation — show Japanese original

2代目駅舎供用開始。

1930 12月27日

The east exit was opened.

Machine translation — show Japanese original

東口が開設される。

1931

Around this time, the station had wooden station buildings at the west and east exits, connected by an underground passageway, and the current location of the west exit staircase was the site of the original platform, which had a wooden fence due to the absence of passenger trains on the freight line, while the so-called First Crossing had connected the east and west until before the war, but was abolished after the war due to increased traffic volume.

Machine translation — show Japanese original

この頃、当駅は西口と東口にそれぞれ木造の駅舎を構え、その間を地下通路でつなぐ構造になっていた。現在西口の階段があるところが開業時の本屋側ホーム跡であったが、ここを走る貨物線には列車が停車しないため、木製の柵が設けられていた。また、戦前までは通称第一踏切が東西を結んでいたが、戦後交通量増大で廃止された。

1931 12月1日

The section of the Tōhoku Main Line between Warabi Station and Yono Station was quadrupled with the addition of two freight lines, which did not have platforms at this station.

Machine translation — show Japanese original

東北本線蕨駅 - 与野駅間の貨物線2線が増設され複々線化。貨物線は当駅にホームを設置しなかった。

1932 9月1日

The Tōhoku Main Line electric train, now the Keihin-Tohoku Line, extended to Ōmiya Station and began operating in the section including this station, and until 1968, most Tōhoku Main Line trains, including Takasaki Line trains, passed through this station.

Machine translation — show Japanese original

東北本線電車(現在の京浜東北線)が大宮駅まで延伸開業し、当駅を含む区間で運行を開始。1968年まで東北本線列車(高崎線列車含む)のほとんどが当駅を通過するようになった。1968年の東北本線6線化まで、京浜東北線電車と東北・高崎線の中・長距離列車が同じレール上を走っていた。また、当駅南西に貨物駅が併設されており、貨物駅の配線が西口駅舎ぎりぎりまで伸びていた。この場所は現在東北貨物線が高架でまたいでおり、そのガード下に保線区が設けられている。昭和5年度の乗車人員は全国有鉄道中17位の中枢駅であったことから、埼玉県議会は鉄道大臣に停車の請願を行った。

1960 1月16日

Freight handling was abolished, and remnants of the freight station still exist, with the Urawa Post Office (now Urawa-Naka Post Office) located near the station.

Machine translation — show Japanese original

貨物取り扱いを廃止する。現在も貨物駅の名残りとして当駅至近に浦和郵便局(現・浦和中郵便局)が所在する。

1967 10月20日

In preparation for the 6-track expansion of the Tōhoku Main Line between Akabane Station and Yono Station, the west entrance station building was rebuilt, completing the 2-story west entrance station building that existed until 2012.

Machine translation — show Japanese original

東北本線赤羽駅 - 与野駅間6線化に備え、西口駅舎を改築(3代目駅舎)。2012年まで存在した2階建て西口駅舎が竣工する。

1968 9月25日

Two electrified lines were added to the section between Akabane Station and Yono Station on the Tohoku Main Line, increasing the total number of lines to six, and the Keihin-Tohoku Line trains and Tohoku and Takasaki Line trains were separated for the first time.

Machine translation — show Japanese original

東北本線赤羽駅 - 与野駅間に電車線2線が増設され6線化。京浜東北線電車と東北・高崎線列車が初めて分離される。早くから市街化が進んでいた当駅周辺では新たな2線分の土地を確保できず、貨物駅のあった土地に高架の新設貨物線を通し、旧来貨物線として使われていたスペースに東北線列車(高崎線列車含む)を通したため、地上を走る電車線、旅客線と西口駅舎背後を高架で走る貨物線という状況となった(いわゆる「通勤五方面作戦」の一環)。

1968 10月1日

New platforms were added to the Tohoku passenger line, and mid-distance trains began stopping during morning and evening rush hours only.

Machine translation — show Japanese original

東北旅客線にホームを新設。朝夕ラッシュ時のみ中距離列車が停車を開始。

1982 11月15日

Mid-distance trains began stopping at the station throughout the day.

Machine translation — show Japanese original

中距離列車の終日停車を開始。

1986 11月1日

Freight handling was abolished.

Machine translation — show Japanese original

荷物扱い廃止。

1987 4月1日

With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East).

Machine translation — show Japanese original

国鉄分割民営化に伴い、東日本旅客鉄道(JR東日本)の駅となる。

2001 11月18日

The IC card "Suica" becomes available for use.

Machine translation — show Japanese original

ICカード「Suica」の利用が可能となる。

2003 10月26日

Accompanying the elevation work, the down line of the Tohoku Main Line was relocated, and the elevation work was started due to the city being divided east and west by the station since its opening and the structural inability to stop the Shonan-Shinjuku Line, for which the method of securing a site for elevated construction on the east side of the Keihin-Tohoku Line and shifting one line to the east side was adopted to secure a platform for the Shonan-Shinjuku Line.

Machine translation — show Japanese original

高架化工事に伴い東北本線下り線を移設。開業以来市街地が駅によって東西に分断されていたことや、構造上停車できなかった湘南新宿ラインを停車させることを理由に高架化工事が開始。湘南新宿ラインの停車ホームを捻出するため、京浜東北線の東側に高架建設用の用地を確保し1線ずつ東側へずらす方法が採られた。まず高架化工事前に、東北旅客線ホーム南側にあった保線機械用の留置線を撤去し、列車線と京浜東北線のホームと線路を西へ移設するための線路切り替えを行い、東側用地の捻出を完了させた。

2004 2月23日

The Up Tōhoku Main Line was relocated due to elevated track construction work.

Machine translation — show Japanese original

高架化工事に伴い東北本線上り線を移設。

2004 5月30日

The northbound track of the Keihin-Tohoku Line was relocated due to elevated track construction work.

Machine translation — show Japanese original

高架化工事に伴い京浜東北線北行き線路を移設。

2004 11月28日

The southbound track of the Keihin-Tohoku Line was relocated due to elevated track construction work.

Machine translation — show Japanese original

高架化工事に伴い京浜東北線南行き線路を移設。

2007 1月14日

The east side of the Keihin-Tohoku Line was constructed with elevated tracks and platforms, and the southbound Keihin-Tohoku Line (Track 1) was relocated to the newly built elevated line.

Machine translation — show Japanese original

京浜東北線の東側に高架線路とホームを建設し、京浜東北線南行(1番線)を新設の高架線に移設。

2008 5月18日

The old southbound line was rebuilt with an elevated line, and the northbound Keihin-Tohoku Line was relocated to the newly constructed elevated line, completing the elevated platform for the Keihin-Tohoku Line, which became the first fully elevated station on the line within the prefecture.

Machine translation — show Japanese original

旧南行線上に高架線路を建設し、京浜東北線北行(2番線)を新設の高架線に移設。これにより京浜東北線高架ホームが完成。県内の京浜東北線では初の全面高架駅となった。

2009 12月20日

The old northbound line was rebuilt with elevated tracks and platforms, and the up track of the Tōhoku passenger line (Utsunomiya Line) was relocated to the newly constructed elevated line.

Machine translation — show Japanese original

旧北行線上に高架線路とホームを建設し、東北旅客線(宇都宮線)上り(3番線)を新設の高架線に移設。

2011 3月6日

An elevated line was constructed on the former up line, and the down Tōhoku Passenger Line (Utsunomiya Line) (No. 4 track) was relocated to the newly constructed elevated line, completing the elevated platform for the Tōhoku Passenger Line.

Machine translation — show Japanese original

旧上り線上に高架線路を建設し、東北旅客線(宇都宮線)下り(4番線)を新設の高架線に移設。これにより東北旅客線高架ホームが完成。

2012

In the spring, construction began on the 5th and 6th platform of the Tohoku Freight Line, used for the Shonan-Shinjuku Line.

Machine translation — show Japanese original

春:東北貨物線(湘南新宿ライン)の5・6番線ホームを施工開始。

2012 7月8日

An elevated line was constructed on the former down track, and the southbound Tohoku Freight Line was relocated to the newly constructed elevated line.

Machine translation — show Japanese original

旧下り線上に高架線路を建設し、東北貨物線南行を新設の高架線に移設。

2013 3月16日

With the completion of the station's elevated structure construction, a new platform was added for the Tohoku freight line, and the Shonan-Shinjuku Line and Tobu Railway's direct limited express trains, including the Nikko, Kinugawa, and Spacia Kinugawa, as well as the temporary Super View Odoriko train that starts and ends at Omiya Station, began stopping at the station, and a commemorative group temporary train, the Shonan-Shinjuku Line Urawa Station Stop Commemoration train, was operated using the 253 series between Urawa Station and Atami Station.

Machine translation — show Japanese original

駅周辺高架化工事完了に伴い、東北貨物線にホームを新設。湘南新宿ラインと東武鉄道直通特急「日光」・「きぬがわ」・「スペーシアきぬがわ」、また大宮駅始発・終着で運転される臨時「スーパービュー踊り子」が停車となる。また同日にはこれを記念して浦和駅 - 熱海駅間に団体臨時列車「湘南新宿ライン浦和駅停車記念号」が253系を用いて運転された。高架下では幅員25m・長さ約50mの東西自由通路が開通し、東西にあった改札が駅中央に集約されたほか、幅員約4mの仲町地下道が平面化され10mに拡幅された。さらに東西自由通路が南北2か所に新設され、3か所の東西自由通路が開通した。駅南側で鉄道と交差する埼玉県道さいたま草加線(都市計画道路田島大牧線)も高架より東側の幅員が25mに拡幅された。

2013 7月20日

Prior to the 130th anniversary of its opening, a special charter train called the "Urawa Station 130th Anniversary Train" will operate between Urawa Station and Yokokawa Station using the 485 series Joyful Train NO.DO.KA.

Machine translation — show Japanese original

開業130周年を前に、浦和駅 - 横川駅間に団体臨時列車「浦和駅開業130周年記念号」が485系ジョイフルトレインNO.DO.KA.を使用して運転される。

2013 7月28日

The 130th anniversary of the opening is commemorated, with commemorative entry tickets for Urawa Station being issued.

Machine translation — show Japanese original

開業130周年を迎え、浦和駅の記念入場券等が発行される。

2014 12月

The Higashi-guchi Station Front Traffic Plaza was completed.

Machine translation — show Japanese original

東口駅前交通広場の整備が完了。

2015 11月25日

The elevated commercial facility "Atre Urawa" (South Area and North Area) under the west exit opened.

Machine translation — show Japanese original

西口高架下商業施設「アトレ浦和」(South Area・North Area)が開業。

2017 3月12日

JR East introduced its "Eco-Station" initiative, which incorporates energy-saving and renewable energy technologies, to Urawa Station, the first in the prefecture, and installed an energy management system, a first for a railway station in Japan, with plans to also install solar panels.

Machine translation — show Japanese original

JR東日本が進める省エネルギーや再生可能エネルギーなどの環境保全技術を駅に導入する取り組み「エコステ」を県内初めて浦和駅に導入。国内の鉄道駅で初めてエネルギーマネジメントシステムを導入する 。同時に太陽光発電パネルなども設置する予定である。

2017 10月21日

The use of platform doors began on the Keihin-Tohoku Line platforms.

Machine translation — show Japanese original

京浜東北線ホームでホームドアの使用を開始。

2018 3月16日

The west entrance station building section "Urawa Atre West Area" opened, and the underground passageway "Urawa Station Nakano-shima Underground Passageway" to the Isetan Urawa store was completed.

Machine translation — show Japanese original

西口駅ビル部分「浦和アトレ West Area」が開業。伊勢丹浦和店方面への地下通路「浦和駅中ノ島地下通路」が完成。

2019 11月30日

In 2019, the operation of View Plaza was terminated.

Machine translation — show Japanese original

(令和元年):びゅうプラザの営業を終了。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Departure Melodies
希望(ゆめ)のまち さいたま市歌
Keihin–Tōhoku Line 京浜東北線・大宮方面行きホーム since 2003年4月1日

タケカワユキヒデ作曲。2003年4月1日のさいたま市の政令指定都市移行を記念して作られた。かつて浦和駅、さいたま新都心駅では短い編曲のメロディも使用されていた。

Keep On Rising 浦和レッズ応援歌
Keihin–Tōhoku Line 1番線(京浜東北線ホーム) since 2007年10月1日

サッカーJリーグ・浦和レッズのホームタウンであることによる。

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (KEIHIN–TŌHOKU LINE)
1 Down
南浦和 · 上野 · 東京
2 Up
北浦和 · 与野 · 大宮
Platforms 1, 2 serve this line

Transfers from this platform

Shōnan–Shinjuku Line JR-East
5 min Moderate
Takasaki Line JR-East
5 min Moderate
Utsunomiya Line JR-East
5 min Moderate
PLATFORM LAYOUT (SHŌNAN–SHINJUKU LINE)
3 Up
赤羽 · 東京 · 横浜
6
Platforms 3, 6 serve this line

Transfers from this platform

Keihin–Tōhoku Line JR-East
5 min Moderate
Takasaki Line JR-East
2 min Easy
Utsunomiya Line JR-East
2 min Easy
PLATFORM LAYOUT (TAKASAKI LINE)
Platform assignment not documented for this line yet

Transfers from this platform

Keihin–Tōhoku Line JR-East
5 min Moderate
Shōnan–Shinjuku Line JR-East
2 min Easy
Utsunomiya Line JR-East
2 min Easy
PLATFORM LAYOUT (UTSUNOMIYA LINE)
3 Up
赤羽 · 東京 · 横浜
Platform 3 serves this line

Transfers from this platform

Keihin–Tōhoku Line JR-East
5 min Moderate
Shōnan–Shinjuku Line JR-East
2 min Easy
Takasaki Line JR-East
2 min Easy

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Urawa Station FAQ

What train lines connect at Urawa Station?

Urawa Station is served by Keihin–Tōhoku Line, Shōnan–Shinjuku Line, Takasaki Line, Utsunomiya Line.