千葉

Chiba Station

Live Network Status Active

Chiba is a major railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
34 Events
1894 7月20日

It opened as a station on the Sōbu Railway and is a normal station.

Machine translation — show Japanese original

総武鉄道の駅として開業。一般駅。

1896 2月25日

Bōsō Railway started operating through here.

Machine translation — show Japanese original

房総鉄道が乗り入れ。

1907 9月1日

The Sōbu Railway and Bōsō Railway were nationalized and became stations under the Imperial Railway Agency.

Machine translation — show Japanese original

総武鉄道・房総鉄道が国有化、帝国鉄道庁の駅となる。

1923 9月1日

It was completely destroyed by the Great Kantō earthquake.

Machine translation — show Japanese original

関東大震災により全壊。

1945 6月10日

It suffered damage from air raids during World War II.

Machine translation — show Japanese original

太平洋戦争下で空襲による被害を受ける。

1963 4月28日

The station was relocated to the current elevated station, eliminating the switchback for the Sobu Main Line towards Tokyo and the Sotobo Line, with 4 platforms and 8 tracks shared by the Sobu Main Line and the Narita Line.

Machine translation — show Japanese original

現在地の高架駅に移転。総武本線東京方面・外房線のスイッチバックを解消。ホームは4面8線で総武本線と成田線が共用だった。

1971 4月1日

The Travel Center opened.

Machine translation — show Japanese original

旅行センター開業{{Cite book|和書|title=交通年鑑|issue=昭和47年版|section=交通日誌|publisher=交通協力会|editor=

1975 5月10日

Freight handling was abolished, making it a passenger station.

Machine translation — show Japanese original

貨物の取扱を廃止(旅客駅となる)。

1981 7月5日

The Tsudanuma-Chiba section was quadrupled.

Machine translation — show Japanese original

津田沼駅 - 千葉駅間複々線化。

1981 12月20日

The grade separation near Nishi-Chiba Station was completed.

Machine translation — show Japanese original

西千葉駅寄りの立体交差化完成。

1984 2月1日

The 9 and 10 platform was added, becoming the platform for the Narita Line.

Machine translation — show Japanese original

9・10番線ホームを増設。成田線ホームとなる。

1987 4月1日

With the privatization of JNR, it became a station of East Japan Railway Company (JR East).

Machine translation — show Japanese original

国鉄分割民営化により、東日本旅客鉄道(JR東日本)の駅となる。

1991 6月12日

The Chiba Urban Monorail Line 2 opened, initially with a temporary station located about 100 m closer to Chiba Park Station.

Machine translation — show Japanese original

千葉都市モノレール2号線開業。当初は約100 m千葉公園駅寄りの仮駅だった。

1993 9月11日

Automatic ticket gates were installed at the east exit and began operation.

Machine translation — show Japanese original

東口に自動改札機を設置し、供用開始。

1995 8月1日

The Chiba Urban Monorail Line 1 opened, and this station also opened at the same time.

Machine translation — show Japanese original

千葉都市モノレール1号線開業。本駅もこの時に開業。

1997

In the summer, a wheelchair-accessible escalator was installed and put into service between the former 1st floor concourse and platforms 9 and 10.

Machine translation — show Japanese original

夏:旧1階コンコースと9・10番線ホームとの間に車いす対応エスカレーターを設置し、供用開始。

1997 2月19日

A wheelchair-accessible escalator was installed and opened to traffic between the former 1st floor concourse and platforms 3 and 4.

Machine translation — show Japanese original

旧1階コンコースと3・4番線ホームとの間に車いす対応エスカレーターを設置し、供用開始。

1997 3月4日

A wheelchair-accessible escalator was installed and put into service between the former 1st floor concourse and platforms 1 and 2.

Machine translation — show Japanese original

旧1階コンコースと1・2番線ホームとの間に車いす対応エスカレーターを設置し、供用開始。

1997 3月19日

A wheelchair-accessible escalator was installed and put into service between the former 1st floor concourse and platforms 5 and 6.

Machine translation — show Japanese original

旧1階コンコースと5・6番線ホームとの間に車いす対応エスカレーターを設置し、供用開始。

1997 9月29日

A wheelchair-accessible escalator was installed between the former 1st floor concourse and platforms 7 and 8, and its use began, resulting in the installation of escalators on all platforms.

Machine translation — show Japanese original

旧1階コンコースと7・8番線ホームとの間に車いす対応エスカレーターを設置し、供用開始。これにより全ホームにエスカレーターを設置。

2001 11月18日

IC card "Suica" becomes available for use on JR East.

Machine translation — show Japanese original

JR東日本でICカード「Suica」の利用が可能となる。

2009 3月14日

IC card "PASMO" becomes available for use on Chiba Urban Monorail.

Machine translation — show Japanese original

千葉都市モノレールでICカード「PASMO」の利用が可能となる。

2016 4月

The renovation work to modernize the toilet inside the station gate to Western-style was completed.

Machine translation — show Japanese original

駅改札内のトイレの改修工事(洋式化)完了。

2016 11月20日

The current station building and the 3rd floor station Nakashoppu commercial facility "Perie Chiba Ekinaka" opened, and the connecting passages to Chiba Urban Monorail Chiba Station and Keisei Chiba Station were completed.

Machine translation — show Japanese original

現駅舎と3階駅ナカ商業施設「ペリエ千葉エキナカ」が開業。千葉都市モノレール千葉駅間および京成千葉駅との連絡通路が完成。

2017 3月

Renovation work on the toilet outside the station gate (western-style conversion) and renovation work on the wheelchair-accessible toilet (multi-functionalization) have been completed.

Machine translation — show Japanese original

駅改札外のトイレの改修工事(洋式化)と、車椅子用トイレの改修工事(多機能化)完了。

2017 4月27日

The 4th floor section of Perie Chiba Ekimae was completed and fully opened.

Machine translation — show Japanese original

「ペリエ千葉エキナカ」の4階部分が完成し、全面開業。

2017 9月7日

The station building opened ahead of schedule, with floors 2 and above.

Machine translation — show Japanese original

駅ビル先行開業(2階以上)。

2018 6月28日

The station building fully opened.

Machine translation — show Japanese original

駅ビル全面開業。

2019 8月31日

In 2019, the installation of platform gates was completed.

Machine translation — show Japanese original

(令和元年):ホーム柵設置工事完了。

2020 2月16日

The Tokyo Area Transport System (ATOS) was introduced.

Machine translation — show Japanese original

東京圏輸送管理システム(ATOS)を導入。

2020 3月31日

Byū Plaza ended its operations.

Machine translation — show Japanese original

びゅうプラザの営業を終了。

2020 11月27日

The station-naka shared office "STATION BOOTH" opened inside the ticket gates.

Machine translation — show Japanese original

改札内に駅ナカシェアオフィス「STATION BOOTH」が開業。

2024 3月28日

The use of platform screen doors began on Platform 1 for the Sobu Line local service.

Machine translation — show Japanese original

1番線(総武線各駅停車)ホームでスマートホームドアの使用を開始

2025 3月13日

The use of platform screen doors began on Platform 2 for the Sobu Line local trains.

Machine translation — show Japanese original

2番線(総武線各駅停車)ホームでスマートホームドアの使用を開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Departure Melodies
静けさで心が和らぐ改善
Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (CHŪŌ–SŌBU LINE (LOCAL))
1・2 Down
西船橋 · 秋葉原 · 新宿
Platforms 1, 2 serve this line

Transfers from this platform

Narita Line Transit
5 min Moderate
Sōbu Line (Rapid) JR-East
2 min Easy
Sobumain Line Transit
5 min Moderate
Show 1 more transfer
Sotobō Line JR-East
5 min Moderate
PLATFORM LAYOUT (SŌBU LINE (RAPID))
3・6 Up
東京方面 特急「新宿さざなみ」「新宿わかしお」(新宿方面)
7・10 Up
東京方面 特急「しおさい」「成田エクスプレス」(東京方面) 特急「あずさ」「富士回遊」(大月方面)
Platforms 3, 6, 7, 10 serve this line

Transfers from this platform

Chūō–Sōbu Line (Local) JR-East
2 min Easy
Narita Line Transit
5 min Moderate
Sobumain Line Transit
5 min Moderate
Show 1 more transfer
Sotobō Line JR-East
5 min Moderate
PLATFORM LAYOUT (SOTOBŌ LINE)
Platform assignment not documented for this line yet

Transfers from this platform

Chūō–Sōbu Line (Local) JR-East
5 min Moderate
Narita Line Transit
2 min Easy
Sōbu Line (Rapid) JR-East
5 min Moderate
Show 1 more transfer
Sobumain Line Transit
2 min Easy
PLATFORM LAYOUT (UCHIBŌ LINE)
3・4 Down
木更津 · 館山方面 特急「新宿さざなみ」(館山方面)
5・6 Down
茂原 · 安房鴨川 · 東金方面 特急「新宿わかしお」(安房鴨川方面)
Platforms 3, 4, 5, 6 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Chiba Station FAQ

What train lines connect at Chiba Station?

Chiba Station is served by Chūō–Sōbu Line (Local), Sōbu Line (Rapid), Sotobō Line, Uchibō Line.