Riding today
Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...
About this station
History, melodies, surroundings
Station History & Timeline
20 Events
1897
6月5日
It was completed as a freight station and began operating on the 8th.
Machine translation — show Japanese original
貨物駅として完成。8日より営業開始。
1898
5月8日
It began operating as a regular station.
Machine translation — show Japanese original
普通停車場として営業開始。
1898
12月
The station building was completed.
Machine translation — show Japanese original
駅舎竣工。
1906
11月1日
Nationalization.
Machine translation — show Japanese original
国有化。
1907
The yard was greatly expanded.
Machine translation — show Japanese original
構内を大拡張。
1909
10月12日
The station became part of the Mito Line due to the designation of line names.
Machine translation — show Japanese original
線路名称制定により、水戸線の駅となる。
1917
4月7日
A new weighbridge with a capacity of 30 tons was installed on Track 2.
Machine translation — show Japanese original
2番線に計重台(秤量30トン)を新設。
1922
9月26日
A crossing guard house was newly established at the street crossing due to the frequent passage of stone-loading cars.
Machine translation — show Japanese original
石材積み込みの車の往来が多いため、街道踏切に踏切番舎を新設。
1931
2月14日
A 3-ton gantry crane was newly installed on the first platform.
Machine translation — show Japanese original
第1ホームにガントリークレーン(能力3トン)を新設。
1936
2月10日
A simple gate-type crane with a capacity of 3t was newly installed on the 3rd platform.
Machine translation — show Japanese original
第3ホームに簡易門型クレーン(能力3t)を新設。
1936
10月12日
A 3-ton capacity gantry crane was newly installed on the second platform.
Machine translation — show Japanese original
第2ホームにガントリークレーン(能力3トン)を新設。
1958
12月19日
A freight car mover (Kato Manufacturing diesel) was deployed.
Machine translation — show Japanese original
貨車移動機(加藤製作所ディーゼル)を配備。
1976
1月9日
Freight car movers (10-ton machines) with trailing cars were deployed.
Machine translation — show Japanese original
貨車移動機(10トン機)連動付車を配備。
1984
2月1日
Freight handling was abolished and the station became an unstaffed station.
Machine translation — show Japanese original
貨物扱い廃止。駅員無配置駅となる。
1987
4月1日
With the privatization of JNR, it became a station of East Japan Railway Company (JR East).
Machine translation — show Japanese original
国鉄分割民営化により、東日本旅客鉄道(JR東日本)の駅となる。
2001
11月18日
The IC card Suica service was launched.
Machine translation — show Japanese original
ICカードSuicaの供用を開始。
2009
3月14日
Departure melodies were introduced.
Machine translation — show Japanese original
発車メロディを導入。
2013
3月6日
The new station building was opened for service.
Machine translation — show Japanese original
新駅舎供用開始。
2014
3月30日
The "Ishi no Hyakunenkan" was opened in front of the station.
Machine translation — show Japanese original
駅前に「石の百年館」開設。
2024
8月1日
The agency ended its commission to sell tickets on behalf of Kasama City, resulting in the station being unstaffed all day.
Machine translation — show Japanese original
笠間市による乗車券委託販売(簡易委託)の受託を解除し、終日無人化。
Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.
Landmarks
Accessibility
✓
Standard Access
Getting around
Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (MITO LINE)
1
Down
水戸
2
Up
小山
↕ Platforms 1, 2 serve this line
Community Photos
Photos shared by riders. Been to this station? Add yours.
Loading photos…
Inada Station FAQ
What train lines connect at Inada Station?
Inada Station is served by Mito Line.