Kita Koshigaya is a railway station in Tokyo.

Kita-Koshigaya Station (北越谷駅) in Koshigaya, Saitama, is run by Tobu Railway and serves the Tobu Skytree Line. It is an elevated station that opened on 27 August 1899 as Koshigaya Station (越ヶ谷駅).

History

The station opened on 27 August 1899 as Koshigaya Station (越ヶ谷駅), when the Tobu line from Kita-Senju to Kuki opened. It was renamed Bushū-Ōsawa (武州大沢) on 20 November 1919, and Kita-Koshigaya on 1 December 1956. A street television was set up in front of the station in July 1956. In March 1962 an elevated station building and a west exit were built. On 31 May 1962, when the Hibiya Line opened between Kita-Senju and Ningyōchō, through running to this station began.

On 4 August 1992 the elevated works began. The bridge station building and footbridge closed, and a two-storey temporary station was built on the Koshigaya side of the east exit, with an underpass toward the west side. On 2 August 1994 a lead track stopped being used during the timetable change, so trains that turned here went on to Ōbukuro (大袋) to turn back. On 25 March 1997 the elevated double-double track to Koshigaya was completed, and except for a few early and late trains, trains that started or ended here now run to and from Koshigaya.

The up line was elevated on 11 September 1998, and the down line on 9 September 1999, which completed the elevated tracks. An automatic gate and a west passage were installed at the same time, and the temporary station and west underpass closed. On 28 March 2001 the four-track elevated line was completed, and trains began to start and end here again. On 19 March 2003 through running to the Hanzōmon Line (半蔵門線) and Tokyu Den-en-toshi Line (東急田園都市線) began, and a section express became the first non-local train to start and end here. On 18 March 2006 that section express became a semi-express, and new semi-express trains to and from Asakusa began here.

The departure melody was introduced on 8 December 2011. On 16 March 2013 daytime section express trains were discontinued. In the daytime only Hibiya Line through trains run, and trains to Asakusa run only in the morning and at night. A waiting room opened on 1 March 2019. On 7 June 2020 the first platform got platform doors.

See all 18 dated events in the Data view →

Written by an AI from this station's own sourced facts (the dated events in the Data view), nothing else, and checked by a program for dates and numbers that are not in those facts. It can still be wrong. Found a mistake? . Adapted from Japanese Wikipedia, CC BY-SA 4.0; this text is shared under the same licence.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
18 Events
1899 8月27日

The station was opened as Koshigaya Station when the Tobu Railway line between Kita-Senju Station and Kuki Station was inaugurated.

Machine translation — show Japanese original

東武鉄道北千住駅 - 久喜駅間開通時に越ヶ谷駅(こしがやえき)として開設。

1919 11月20日

The station was renamed Bushu-Osawa Station.

Machine translation — show Japanese original

武州大沢駅(ぶしゅうおおさわえき)に改称。

1956 7月

A street television was newly installed in the station front plaza.

Machine translation — show Japanese original

駅前広場に街頭テレビ新設。

1956 12月1日

It was renamed Kita-Koshigaya Station.

Machine translation — show Japanese original

北越谷駅(きたこしがやえき)に改称。

1962 3月

The elevated station building was completed and a new west exit was established.

Machine translation — show Japanese original

橋上駅舎完成、西口新設。

1962 5月31日

With the opening of the Hibiya Line between Kita-Senju Station and Ningyocho Station, mutual through operation to this station began.

Machine translation — show Japanese original

日比谷線北千住駅 - 人形町駅間開通に伴い、当駅まで相互直通運転開始。

1992 8月4日

With the start of elevated construction, the bridge-style station building and overpass were abolished, and a two-story temporary station building was newly established on the east side towards Koshigaya, and an underground passageway to the west exit was newly established near the former east exit.

Machine translation — show Japanese original

高架工事開始に伴い橋上駅舎と跨線橋が廃止、東口の越谷寄りに二階建ての仮駅舎と旧東口の出口付近に西口方面への地下通路が新設される。

1994 8月2日

With the progress of the timetable revision and elevated track work, the station's lead track was taken out of service, and trains that previously turned back at the station were instead sent to nearby Obukuro Station to turn back.

Machine translation — show Japanese original

ダイヤ改正及び高架工事進歩に伴い駅構内の引上線が使用停止、同駅折返しの列車は1つ隣の大袋駅まで回送し折り返す。

1997 3月25日

With the completion of the elevated quadruple-tracking to Koshigaya, all trains originating or terminating at this station, except for two during early morning and late night hours, were changed to originate or terminate at Koshigaya instead.

Machine translation — show Japanese original

越谷まで高架複々線化完成に伴い、早朝・深夜帯2本を除き当駅始発・終着列車が越谷発着へ変更。

1998 9月11日

The up line was elevated.

Machine translation — show Japanese original

上り線高架化。

1999 9月9日

With the elevation of the down line, the elevated lines for both up and down tracks were completed, and automatic ticket gates were installed, a new free passage was opened between the east and west, and the temporary station building and the underground passage to the west exit were abolished.

Machine translation — show Japanese original

下り線高架化に伴い、上下高架線完成。自動改札機設置及び東西自由通路新設に伴い仮駅舎と西口方面への地下道廃止。

2001 3月28日

With the completion of the elevated quadruple-tracking, all trains originating from and bound for Koshigaya were changed to originate from and terminate at this station.

Machine translation — show Japanese original

高架複々線化完了に伴い、越谷発着列車は全て当駅始発・終着に戻される。

2003 3月19日

With the start of through operations between the Hanzomon Line and the Tokyu Den-en-toshi Line, the station saw its first non-local commuter semi-express trains with starting and terminating services.

Machine translation — show Japanese original

半蔵門線・東急田園都市線相互直通運転開始に伴い、半蔵門線直通の区間準急列車の当駅始発・終着が各停以外で初めて設定される。

2006 3月18日

The aforementioned local semi-express trains were changed to semi-express and new semi-express trains with starting and terminating services at this station on the Asakusa-bound section were established.

Machine translation — show Japanese original

上記の区間準急は準急へ種別変更され、新たに浅草発着区間準急列車の当駅始発・終着が設定される。

2011 12月8日

Departure melodies were introduced.

Machine translation — show Japanese original

発車メロディ導入。

2013 3月16日

With the timetable revision, the daytime semi-express service was abolished, and daytime operations were limited to through trains on the Tokyo Metro Hibiya Line, with trains to and from Asakusa Station only operating during morning and evening hours.

Machine translation — show Japanese original

ダイヤ改正に伴い、日中の区間準急が廃止。日中は東京メトロ日比谷線直通列車のみの運行となり、浅草駅発着の列車は朝と夜の時間帯のみの運行となった。

2019 3月1日

A waiting room was newly established.

Machine translation — show Japanese original

待合室新設。

2020 6月7日

Platform screen doors on Platform 1 began operation.

Machine translation — show Japanese original

1番線ホームドア使用開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Nearby landmarks not documented yet
Accessibility
Step-free access and facilities not documented yet

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (TS TOBU SKYTREE LINE)
1 Up
新越谷 · 北千住 · とうきょうスカイツリー
2 Up
新越谷 · 北千住 · とうきょうスカイツリー
3 Down
北春日部 · 東武動物公園 · 日光線 南栗橋
4 Down
春日部 · 東武動物公園 · 伊勢崎線 久喜
↕ Platforms 1, 2, 3, 4 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Kita-Koshigaya Station FAQ

What train lines connect at Kita-Koshigaya Station?

Kita-Koshigaya Station is served by TS Tobu Skytree Line.