佐倉駅

Sakura Station

Live Network Status Active

Sakura is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
17 Events
1894 7月20日

The station was established with the opening of the Sōbu Railway's Ichikawa - this station section.

Machine translation — show Japanese original

総武鉄道の市川駅 - 当駅間開業により開設。

1897 1月19日

The section between the current station and Narita Station on the Narita Railway opened.

Machine translation — show Japanese original

成田鉄道の当駅 - 成田駅間が開業。

1897 5月1日

The Sōbu Railway was extended and opened between the current station and Narutō Station.

Machine translation — show Japanese original

総武鉄道の当駅 - 成東駅間が延伸開業。

1907 9月1日

The Sōbu Railway was acquired and became a station of the Imperial Railway Agency.

Machine translation — show Japanese original

総武鉄道が買収され、帝国鉄道庁の駅となる。

1920 9月1日

Narita Railway was nationalized.

Machine translation — show Japanese original

成田鉄道が国有化。

1968 3月28日

The Sōbu Main Line and Narita Line were electrified and doubled-tracked between Chiba Station and Narita Station, and between Chiba Station and this station.

Machine translation — show Japanese original

総武本線・成田線の千葉駅 - 成田駅間電化、千葉駅 - 当駅間複線化。

1969 10月1日

Sakura Passenger and Freight Car District was newly established.

Machine translation — show Japanese original

佐倉客貨車区が新設。

1974 10月26日

The section of the Sōbu Main Line between the current station and Chōshi Station was electrified.

Machine translation — show Japanese original

総武本線の当駅 - 銚子駅間電化。

1984 2月1日

Freight handling was abolished.

Machine translation — show Japanese original

貨物扱い廃止。

1985 12月

The station was elevated and the current station building was constructed.

Machine translation — show Japanese original

駅橋上化、現在の駅舎になる。

1986 2月24日

The section between the current station and Narita Station on the Narita Line was double-tracked.

Machine translation — show Japanese original

成田線の当駅 - 成田駅間複線化。

1987 4月1日

With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East).

Machine translation — show Japanese original

国鉄分割民営化に伴い、東日本旅客鉄道(JR東日本)の駅となる。

1991

The Narita Line was modified to accommodate 15-car trains and a 2-face 4-line configuration in preparation for the extension to Narita Airport.

Machine translation — show Japanese original

成田線の成田空港乗り入れに際し15両対応化および2面4線化。

1992 3月

The sale of ekiben at the station was ended, leaving Utsunomiya Station as the only JR station in the Kanto region to continue the practice.

Machine translation — show Japanese original

末:駅弁立売を終了。関東地方のJR駅での駅弁立売は宇都宮駅だけとなった。

1995 2月25日

Automatic ticket gates were installed and put into service.

Machine translation — show Japanese original

自動改札機を設置し、供用開始。

1997

The Sakura Locomotive Depot was abolished.

Machine translation — show Japanese original

佐倉機関区廃止。

2001 11月18日

The IC card "Suica" becomes available for use.

Machine translation — show Japanese original

ICカード「Suica」の利用が可能となる。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (SŌBU MAIN LINE)
1 Down
八街 · 成東 · 八日市場
3・4 Up
千葉 · 東京
Platforms 1, 3, 4 serve this line

Transfers from this platform

Sōbu Line (Rapid) Transit
5 min Moderate

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Sakura Station FAQ

What train lines connect at Sakura Station?

Sakura Station is served by Sōbu Main Line.