辻堂

Tsujido Station

Live Network Status Active

Tsujido is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
37 Events
1913 3月15日

Tsudō Signal Station was opened.

Machine translation — show Japanese original

辻堂信号所開設。

1914 3月26日

The Tsunodashi Stop Establishment Promotion Alliance was established.

Machine translation — show Japanese original

辻堂停車場設置期成同盟会が発足。

1916 12月1日

The station opened as a Japanese National Railways station in Tsunodashi, Fujisawa Town, Kohoku District, to transport goods to the Imperial Japanese Navy's Yokosuka Naval Base gunnery testing facility, and began handling passengers and freight, with the local residents shouldering the burden of the 2,500 tsubo site and construction costs of 2,483 yen.

Machine translation — show Japanese original

日本海軍横須賀鎮守府の砲術試験場(辻堂海岸)への物資運搬を理由に国有鉄道の駅として高座郡藤沢町辻堂に開業。旅客・貨物取り扱いを開始。用地2500坪と建設資金2,483円は住民負担とした(請願駅)。開設記念碑を建立。駅舎は現在の南口のスロープ降り口付近に建てられた。

1923 9月1日

The station building collapsed due to the Great Kantō earthquake.

Machine translation — show Japanese original

関東大震災で駅舎が倒壊。

1924 10月3日

The new station building was completed.

Machine translation — show Japanese original

駅舎新築落成。

1924 12月21日

A telegraph office was established within the station premises.

Machine translation — show Japanese original

構内に電信取扱所が置かれる。

1943 10月1日

In front of the north exit, the Japanese Navy's First Provisions Depot Tsujido Branch Factory, which later became the Kataura Spinning Factory, was established.

Machine translation — show Japanese original

北口前に日本海軍第一衣糧廠辻堂支廠(後に片倉製糸工場となる)が設置される。

1944 3月4日

Enoshima Electric Railway suspends the Tsujido bus line.

Machine translation — show Japanese original

江ノ島電気鉄道が乗合自動車辻堂線を休止する。

1945 12月18日

At 6:35 a.m. on this day, two freight cars exploded while being switched, carrying incendiary bombs of the former Japanese military under orders of the Allied powers, killing 8 people, injuring 6 seriously and 3 lightly, and destroying 14 homes completely, 63 buildings completely, and 335 homes partially, as well as one building of Matsushita Battery Industry Tsukagoshi factory, now Panasonic Energy Tsukagoshi factory, one building of Yamamoto Industry factory, and four buildings of Yoshida Manufacturing factory.

Machine translation — show Japanese original

この日の午前6時35分、連合国軍の命令により旧日本軍の焼夷弾を輸送中(目的地不明。旧横須賀海軍砲術学校辻堂演習場との説あり)、線路入れ替え中に貨車2両が爆発。死者8名、重傷6名、軽傷3名、全壊家屋14戸、全壊63戸、半壊335戸。他に松下電池工業辻堂工場(現在のパナソニック エナジー社湘南工場)1棟、山本工業工場1棟、吉田製作所工場4棟が全壊。

1946 12月8日

The Fujisawa City Tsujido Station area urban planning district readjustment project was decided.

Machine translation — show Japanese original

藤沢都市計画辻堂駅前土地区画整理が決定される。

1953

A west entrance was newly established.

Machine translation — show Japanese original

西口を新設。

1968

The south entrance station front rotary and paving in front of the south entrance station were completed, and the Marusho Building was completed.

Machine translation — show Japanese original

南口駅前ロータリーが完成。南口駅前の舗装完成。丸湘ビル完成。

1969 6月9日

Chūkaku-ha and riot police clashed at the main station.

Machine translation — show Japanese original

中核派と機動隊が本駅で衝突。

1970 4月

The Fujisawa City Route Fujisawa Station Tsujido Line, a 3,540-meter-long road along the Tokaido Main Line, opened.

Machine translation — show Japanese original

藤沢市道藤沢駅辻堂線(東海道本線沿いの延長3540 mの道路)が開通。

1970 5月1日

The handling of luggage and small freight delivery was abolished.

Machine translation — show Japanese original

手荷物および小荷物の配達の取扱を廃止。

1971 9月25日

The business scope was revised to include passengers, luggage, small packages, and cargo handled at the station and on dedicated lines connected to the station, but not delivery.

Machine translation — show Japanese original

営業範囲を旅客、手荷物、小荷物および当駅接続専用線発着車扱貨物(ただし、配達はしない。)へ改正する。

1972 3月15日

The business scope was revised to passengers and freight handling for cars arriving and departing from dedicated lines connected to this station, and luggage handling was abolished.

Machine translation — show Japanese original

営業範囲を旅客および当駅接続専用線発着車扱貨物へ改正し、荷物の取扱を廃止。

1973 9月

A monorail line from the station to Shonan Life Town was planned as the Fujisawa Monorail, but was later put on hold.

Machine translation — show Japanese original

当駅から湘南ライフタウンまでの藤沢モノレールが構想される。後に凍結された。

1974 6月25日

The main body of the overpass crossing the Akamatsu crossing at the west exit was installed, and after the completion of the overpass, the Akamatsu crossing was abolished.

Machine translation — show Japanese original

西口の赤松踏切をまたぐ跨線橋の本体を取り付ける。跨線橋完成後、赤松踏切は廃止された。

1974 10月1日

The business scope was revised to include passenger services and freight services for dedicated lines and car freight.

Machine translation — show Japanese original

営業範囲を旅客、専用線発着車扱貨物へ改正する。

1976

The north entrance station front rotary was completed and bus operations also began at the north entrance.

Machine translation — show Japanese original

北口駅前ロータリーが完成。バスの発着が北口でも開始。

1977 11月

The elevated station was completed and the north-south free passage was opened.

Machine translation — show Japanese original

橋上駅が完成。南北自由通路が開通。

1981 9月1日

The business scope was revised to passengers, and cargo handling was abolished, although a dedicated line continued to the factory of Kanto Special Steel and cargo transportation was carried out.

Machine translation — show Japanese original

営業範囲を旅客へ改正し、貨物の取扱を廃止。関東特殊製鋼の工場へ専用線が続き、貨物輸送を行っていた。

1987 4月1日

With the privatization of JNR, it became a station of East Japan Railway.

Machine translation — show Japanese original

国鉄分割民営化により、東日本旅客鉄道の駅となる。

1994 11月

The Hanatori crossing on the east side of the station was elevated and became the Shonan Tsujido underground passage.

Machine translation — show Japanese original

駅東側にあった羽鳥踏切が立体交差化され、湘南辻堂地下道となる。

1996 3月25日

Automatic ticket gates were installed and put into service.

Machine translation — show Japanese original

自動改札機を設置し、供用開始。

2001 11月18日

The IC card "Suica" began service.

Machine translation — show Japanese original

ICカード「Suica」供用開始。

2007 11月26日

With the progress of the Shonan C-X construction work, the north bus terminal was relocated to a temporary transportation plaza.

Machine translation — show Japanese original

湘南C-Xの工事進捗に伴い、北口バスターミナルを仮設の交通広場に移設。

2009 3月11日

The North Exit transportation plaza was opened, and the North Exit bus stop was relocated.

Machine translation — show Japanese original

北口交通広場供用開始。北口バス乗り場が変更される。

2009 7月9日

The freight down line track was switched as the platform expansion work progressed.

Machine translation — show Japanese original

ホーム拡幅工事の進捗に伴い、貨物下り線の線路切り替えを実施。

2010 5月23日

The up line was relocated and the platform was widened.

Machine translation — show Japanese original

上り線を移設し、ホーム拡幅が行われる。

2011 11月11日

The opening of Terramall Shonan led to the direct connection of the mall and the north exit.

Machine translation — show Japanese original

テラスモール湘南のオープンに伴い、同モールと北口が直結される。

2012 3月30日

The Minami-guchi deck and Nishi-guchi overpass began operating.

Machine translation — show Japanese original

南口デッキ・西口跨線橋の供用開始。

2014 7月1日

It became a station entrusted to JR East Station Service.

Machine translation — show Japanese original

JR東日本ステーションサービスへの業務委託駅となる。

2016 12月1日

The departure melody was changed to "Hamabe no Uta".

Machine translation — show Japanese original

発車メロディを「浜辺の歌」に変更。

2021 3月13日

With the timetable revision, the operation of the Shonan Liner, which had stopped at this station in part, was discontinued, and some Shonan limited express trains began stopping, with the number of daytime Tokyo system trains increasing from 5 to 6.

Machine translation — show Japanese original

ダイヤ改正により、一部が当駅に停車していた「湘南ライナー」の運転を取りやめ。特急「湘南」の一部列車が停車開始。日中の東京系統の停車本数を5本から6本に増発。

2026 12月1日

The 110th anniversary of the opening.

Machine translation — show Japanese original

開業110周年

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Departure Melodies
浜辺の歌
Tōkaidō Line 全ホーム共通 since 2016年12月1日

歌人・林古渓が辻堂海岸の情景を思い描いて作詞した曲であることによる。なお、この曲は、近隣住民の署名活動によって、管轄である横浜支社が変更に至った。

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (TŌKAIDŌ LINE)
1 Down
小田原 · 熱海 · 伊東
2 Up
横浜 · 品川 · 東京
Platforms 1, 2 serve this line

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Tsujido Station FAQ

What train lines connect at Tsujido Station?

Tsujido Station is served by Tōkaidō Line.