松戸

Matsudo Station

Live Network Status Active

Matsudo is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
84 Events
1896 12月25日

It opened as a station on the Nippon Railway.

Machine translation — show Japanese original

日本鉄道の駅として開業。

1906 11月1日

Nippon Railway was nationalized.

Machine translation — show Japanese original

日本鉄道が国有化。

1909 10月12日

The line came under the Jōban Line due to the designation of line names.

Machine translation — show Japanese original

線路名称制定により常磐線の所属となる。

1936 12月11日

The Ueno - Matsudo section was electrified with direct current, and local trains were converted to electric multiple units, making Ueno the starting point for local electric trains.

Machine translation — show Japanese original

日暮里 - 松戸間直流電化。近距離列車が電車化(上野 - 松戸間)、近距離電車の始発駅となる。

1949 6月1日

Japanese National Railways (JNR) was established.

Machine translation — show Japanese original

日本国有鉄道(国鉄)が発足。

1952 6月18日

A new east entrance station building was established and put into service.

Machine translation — show Japanese original

東口駅舎を新設し、供用開始。

1955 4月21日

A station on the New Keisei Line of the New Keisei Electric Railway opened.

Machine translation — show Japanese original

新京成電鉄新京成線の駅が開業。

1964 4月1日

A connecting overpass linking the Japanese National Railways and Shin-Keisei platforms was completed.

Machine translation — show Japanese original

国鉄と新京成のホーム同士を結ぶ連絡跨線橋が完成。

1966 12月27日

A freight car being switched on the main line came into contact with a JNR train, resulting in a collision accident with no fatalities or injuries.

Machine translation — show Japanese original

本線横断中の入換貨物車両と国電が接触事故。死傷者なし。

1967 8月1日

Japanese National Railways discontinued its freight handling operations.

Machine translation — show Japanese original

国鉄の貨物取り扱いを廃止。

1969 3月

The first phase of the Joban Line quadruple-tracking project between Ayase and Matsudo was completed and a ribbon-cutting ceremony was held, and the second phase of the project between Matsudo and Abiko was started.

Machine translation — show Japanese original

綾瀬-松戸間の常磐線複々線化第1期工事が完了しテープカットが行われた。松戸-我孫子間の第2期工事を開始した。

1970 5月16日

Track switching work was carried out in the station yard in conjunction with the quadrupling of the Jōban Line.

Machine translation — show Japanese original

常磐線の複々線化に伴う駅構内の線路切替工事を実施。

1971 2月24日

The upper station building at Shinbashi Station began operation.

Machine translation — show Japanese original

新橋上駅舎使用開始。

1971 4月20日

The mutual direct through operation between the local tracks of the Japanese National Railways Jōban Line and the Teito Rapid Transit Authority Chiyoda Line began at the same time as the quadrupling of the Japanese National Railways Jōban Line, and the station became 3 islands with 6 tracks.

Machine translation — show Japanese original

国鉄常磐線複々線化と同時に緩行線と営団地下鉄千代田線の相互直通運転開始。3面6線になる。

1972 7月1日

The Midori-no-Madoguchi ticket office began operations.

Machine translation — show Japanese original

みどりの窓口の営業を開始。

1973

The replotting of the area around the west exit was completed.

Machine translation — show Japanese original

西口の区画整理が完成。

1977 4月2日

The station building "Box Hill Matsudo" opened.

Machine translation — show Japanese original

駅ビル「ボックスヒル松戸」が開業。

1979 3月9日

In 1979, Shin-Keisei Electric Railway began direct service to Komuro Station, which was later renamed Chiba New Town Chuo Station on the Housing and Urban Development Corporation's Chiba New Town Line, but discontinued the service on July 8, 1992.

Machine translation — show Japanese original

|1979]]年:新京成電鉄が北総開発鉄道(現・北総鉄道)の小室駅(1984年(昭和59年)3月19日からは 住宅・都市整備公団 千葉ニュータウン線千葉ニュータウン中央駅)まで直通運転開始(1992年7月8日直通運転中止)。

1985

The east exit elevated deck was completed.

Machine translation — show Japanese original

東口高架デッキ完成。

1987 1月17日

The platform extension to accommodate 15-car trains was completed, and 15-car mid-distance train operations began.

Machine translation — show Japanese original

ホーム15両化工事完了。中距離列車から15両運行開始

1987 4月1日

With the privatization of Japanese National Railways, the Japanese National Railways stations became East Japan Railway (JR East) stations.

Machine translation — show Japanese original

国鉄分割民営化により、国鉄の駅は東日本旅客鉄道(JR東日本)の駅となる。

1987 8月1日

The west entrance elevated deck and the east-west free passage were completed.

Machine translation — show Japanese original

西口高架デッキ、東西自由通路完成。

1987 11月1日

The Japanese National Railways abolished freight handling.

Machine translation — show Japanese original

国鉄の荷物扱い廃止。

1990 3月

A large karakuri clock, Yume-Hikou, was installed and began operation on the elevated deck at the west exit (removed on May 24, 2008).

Machine translation — show Japanese original

西口高架デッキ上の大型からくり時計夢飛行が設置され運用開始(2008年5月24 日撤去)。

1994 3月19日

Separate ticket gates were established for JR and Shin-Keisei, and intermediate ticket gates (latches) were installed, with automatic ticket gates installed at each JR ticket gate except the station building west exit and the intermediate ticket gates.

Machine translation — show Japanese original

JRと新京成の改札分離及び中間改札(ラッチ)を設置。JRの駅ビル西口以外の各改札口および中間改札口に自動改札機を設置。

1994 5月28日

Automatic ticket gates were installed at the west exit of the JR station building and began operation.

Machine translation — show Japanese original

JRの駅ビル西口に自動改札機を設置し、供用開始。

1996 12月11日

Three escalators connecting the JR ticket gates and each platform were completed.

Machine translation — show Japanese original

JRの改札口と各ホームを結ぶ3基のエスカレーターが完成。

2001 11月18日

IC card "Suica" becomes available for use on JR East.

Machine translation — show Japanese original

JR東日本でICカード「Suica」の利用が可能となる。

2004

In 2004

Machine translation — show Japanese original

|2004]]年

2004 3月

The station was updated to Tsukuba-type ATOS broadcasting, and the departure melodies on the rapid line were changed in August of the same year.

Machine translation — show Japanese original

常磐型ATOS放送に更新,(同年8月に快速線の発車メロディを変更)

2004 10月16日

As of this day, the mid-distance trains on the Jōban Line, formerly known as the old Red trains, were unified under the designation "Rapid" along with the existing rapid trains.

Machine translation — show Japanese original

この日から常磐線の中距離列車(旧赤電)の呼称を旧来の快速と合わせて「快速」に統一。

2006 12月10日

In 2006, Shin-Keisei Electric Railway began single-direction interrunning with Keisei Electric Railway's Chiba Line to Chiba-Chuo Station during daytime hours.

Machine translation — show Japanese original

|2006]]年:新京成電鉄が京成電鉄千葉線千葉中央駅までの日中時間帯の片乗り入れが開始。

2007 3月18日

With the introduction of Green cars on the Joban Line local trains, Green ticket vending machines and Green car stop position indicators were installed on the north side of platforms 1-2 and 3-4 towards Kita-Senju Station, and the stop positions were unified, and announcements were added to guide passengers to trains with Green cars, and on the same day, IC card "PASMO" became available for use on the New Keisei.

Machine translation — show Japanese original

常磐線普通列車にグリーン車が導入されるのに伴い、1・2番線ならびに3・4番線ホームの北千住駅寄りにグリーン券発券機及びグリーン車停車位置表示設置とそれに伴う停車位置の統一、および案内放送にグリーン車設置列車案内追加、同日に新京成でICカード「PASMO」の利用が可能となる。

2007 12月

Station guidance broadcasts were updated to include information on orderly boarding and the final train.

Machine translation — show Japanese original

駅案内放送に整列乗車及び最終列車案内追加。

2008 3月14日

In 2008, the use of Pasnet cards in automatic ticket gates on the New Keisei line was discontinued.

Machine translation — show Japanese original

|2008]]年:(新京成)パスネットの自動改札機での使用を終了。

2010 3月12日

In 2010, the personnel transport train "Ko-unten" to Matsudo Electric Car District, now Matsudo Vehicle Center, ended operation.

Machine translation — show Japanese original

|2010]]年:松戸電車区(現・松戸車両センター)への職員輸送列車「小運転」が運転を終了。

2012 3月12日

The Matsudo Operation Zone and Matsudo Conductor Zone within the station were abolished and integrated into the Ayase Transport Zone and Abiko Transport Zone.

Machine translation — show Japanese original

駅構内にあった松戸運転区・松戸車掌区廃止。綾瀬運輸区、我孫子運輸区に統合。

2012 3月16日

The station building "Box Hill Matsudo" was renamed to "Atre Matsudo" and had its grand opening, with a full renovation of the 3rd to 6th floors.

Machine translation — show Japanese original

駅ビル「ボックスヒル松戸」が「アトレ松戸」へ改称され、グランドオープン。3階 - 6階が全面リニューアル。。

2013 7月1日

In 2019, the elevators at Atre Matsudo began to be open during station operating hours.

Machine translation — show Japanese original

(令和元年):アトレ松戸のエレベーターが駅営業時間内開放開始。

2014 2月1日

The soba noodle restaurant "Men-dokoro Ittchin" under the central stairs of the 7th and 8th platform of the Shin-Keisei Line changed its sign to "Men-dokoro Nagishimaya" (it temporarily closed in October of the same year and reopened in December).

Machine translation — show Japanese original

新京成線7・8番線ホーム中央階段下の駅そば「めん処一眞」が「めん処長島屋」に屋号を変更(同年10月一時休店、12月再開)。

2014 2月23日

Shin-Keisei Electric Railway assigned the station number "SL01" to its station.

Machine translation — show Japanese original

新京成電鉄の駅に駅番号「SL01」を設定。

2014 11月21日

An elevator connecting the ticket gate floor and the New Keisei Electric Railway's 7 and 8 platform began operation.

Machine translation — show Japanese original

改札階と新京成電鉄7・8番線ホームを連絡するエレベーターが使用を開始。

2015 3月14日

The Ueno-Tokyo Line opened, and simultaneously it was excluded from being a limited express train stop.

Machine translation — show Japanese original

上野東京ライン開業。同時に特急列車停車駅から除外される。

2015 6月19日

The soba noodle restaurant "Menjo Nagishimaya" located under the central stairs of the Shin-Keisei Line 7 and 8 platform closed on this day.

Machine translation — show Japanese original

新京成線7・8番線ホーム中央階段下の駅そば「めん処長島屋」がこの日をもって閉店。

2015 11月27日

The Oedo Soba Matsudo store closed on this day.

Machine translation — show Japanese original

大江戸そば松戸店がこの日をもって閉店。

2015 12月10日

The NewDays Matsudo store on the passageway of the elevated station building closed on this day, and NewDays Kiosk Matsudo Gate Outer Store, a kiosk-type store, opened in front of the ticket gate on the 12th, with an Event Space re-established in the former e Sports Station location.

Machine translation — show Japanese original

橋上駅舎通路上のNewDays松戸店がこの日をもって閉店(12日に改札出口前にNewDays Kiosk松戸改札外店(キヨスク型店舗)がオープン、旧「eスポーツ ステーション」跡に「イベントスペース」を再設置。

2017 7月13日

In 2017, barrier-free construction began at the station, including the installation of a multi-function toilet inside the central ticket gate and elevators on the north side of all platforms towards Kitasenju.

Machine translation — show Japanese original

|2017]]年:駅バリアフリー工事が開始される(中央改札構内に多機能トイレ及び全ホーム北千住側にエスカレーター設置)。

2018 5月30日

The escalators and elevators at the west entrance station plaza began operating.

Machine translation — show Japanese original

西口駅前広場のエスカレーター・エレベーターの利用開始。]

2018 8月1日

The Jōban Line local train platforms, with some exceptions, ceased handling departure melodies.

Machine translation — show Japanese original

常磐線各駅停車のホームにおいて、一部列車を除いて発車メロディの取り扱いを停止。

2018 10月1日

The station building's north exit, west exit, and the transfer ticket gate on the north exit side were converted to IC card exclusive use, resulting in the removal of ticket vending machines and fare adjustment machines at the north exit and transfer ticket gate, which were replaced with IC card charging machines, and around this time, air-conditioned waiting rooms were installed on the Kashima side of platforms 1 and 2 and the Kinshicho side of platforms 5 and 6.

Machine translation — show Japanese original

駅ビル北口・駅ビル西口および駅ビル北口側の連絡改札がIC専用化、それに伴い駅ビル北口および連絡改札の券売機・精算機が撤去されICカードのチャージ専用機が設置される、またこの頃、1・2番線ホーム柏側と5・6番線ホーム金町側に空調完備の待合室が設置される。

2019 3月16日

The Jōban Line local train platforms stopped handling departure melodies for all trains.

Machine translation — show Japanese original

常磐線各駅停車のホームにおいて、すべての列車の発車メロディの取り扱いを停止。

2019 3月30日

Byū Plaza ended its operations.

Machine translation — show Japanese original

びゅうプラザの営業を終了。

2019 4月26日

The 7th-floor restaurant floor of the station building "Atre Matsudo" was renovated.

Machine translation — show Japanese original

駅ビル「アトレ松戸」の7階レストランフロアがリニューアル。

2019 6月18日

The 8th floor service floor of the station building "Atre Matsudo" was renovated.

Machine translation — show Japanese original

駅ビル「アトレ松戸」の8階サービスフロアがリニューアル。

2019 11月28日

An elevator connecting the ticket gate floor and the platforms for tracks 5 and 6 began operation.

Machine translation — show Japanese original

改札階と5・6番線ホームを連絡するエレベーターが使用を開始。

2020 1月15日

An elevator connecting the ticket gate floor and the platforms for tracks 1 and 2 began operation.

Machine translation — show Japanese original

改札階と1・2番線ホームを連絡するエレベーターが使用を開始。

2020 3月6日

An elevator connecting the ticket gate floor and the platforms for tracks 3 and 4 began operation.

Machine translation — show Japanese original

改札階と3・4番線ホームを連絡するエレベーターが使用を開始。

2020 3月13日

The rooftop garden "Garden Terrace" opened on the 8th floor of the station building "Atre Matsudo".

Machine translation — show Japanese original

駅ビル「アトレ松戸」の8階に屋上庭園「ガーデンテラス」がオープン。

2020 3月26日

The NewDays KIOSK Matsudo Station 3rd platform store on the 3rd and 4th platform closed.

Machine translation — show Japanese original

3・4番線ホーム上のNewDays KIOSK 松戸駅3番線ホーム店が閉店。

2020 9月1日

A limited-time store called "Event Station" has opened on the former site of the old NewDays Kiosk Matsudo ticket gate outside store.

Machine translation — show Japanese original

旧NewDays Kiosk松戸改札外店の跡地に、期間限定店舗「イベントステーション」がオープン。

2021 1月24日

A Jexer e-Sports Station has opened on the former View Plaza site.

Machine translation — show Japanese original

びゅうプラザ跡地に「ジェクサー・eスポーツ ステーション」が開店。

2021 7月22日

From this day, the stopping position of all trains on the Shin-Keisei Line was changed to one car length towards the Kamihongō side.

Machine translation — show Japanese original

この日から、新京成線の全列車の停車位置が1両分上本郷側に変更。

2021 11月1日

The staircase on the north side of the west exit of the elevated station building was closed from this day.

Machine translation — show Japanese original

橋上駅舎西口北側階段がこの日から閉鎖。

2022 3月15日

The "STATION WORK" was installed in the Atre Kitaguchi connecting passage.

Machine translation — show Japanese original

「STATION WORK」がアトレ北口連絡通路に設置。

2023 10月31日

Jexer e-Sports Station closed on this day.

Machine translation — show Japanese original

「ジェクサー・eスポーツ ステーション」かまこの日をもって閉店、

2024 1月6日

The Matsudo City Administrative Service Center relocated to the 8th floor of Atre Matsudo on this day.

Machine translation — show Japanese original

松戸市行政サービスセンターがこの日をもってアトレ松戸の8階に移転。

2024 3月9日

The Veks Coffee Shop Matsudo store closed on this day.

Machine translation — show Japanese original

「ベックスコーヒーショップ 松戸店」がこの日をもって閉鎖。

2024 3月31日

The former "e Sports Station" site's event space was closed.

Machine translation — show Japanese original

旧「 eスボーツ ステーション」跡のイベントスペースか閉鎖。

2024 4月26日

The use of platform doors began on the Joban Line local train platform at tracks 4-6.

Machine translation — show Japanese original

常磐線各駅停車(4 - 6番線)ホームにてホームドアの使用を開始。

2024 5月24日

A NewDays Matsudo Gate Inside store, a completely cashless store, opened inside the ticket gates.

Machine translation — show Japanese original

改札内にNewDays松戸改札内店がオープン(完全キャッシュレス店舗)。

2024 6月16日

The staircase at the east exit of the bridge-style station building was closed and a new east exit staircase was established above the former east-west free passage.

Machine translation — show Japanese original

橋上駅舎の東口の階段を閉鎖。旧東西自由通路上に東口階段を新設。

2024 8月6日

The Atre West Gate ticket gate was temporarily closed due to station improvement work.

Machine translation — show Japanese original

駅改良工事のため。アトレ西口改札を一時閉鎖。

2024 11月18日

The west side of the east-west free passage was closed due to the construction of the new station building.

Machine translation — show Japanese original

新駅ビル建設のため、東西自由通路の西口側を閉鎖。

2024 11月24日

The Midori-no-Madoguchi and New Keisei ticket counters and commuter pass sales offices were relocated to the former East-West Free Passage.

Machine translation — show Japanese original

みどりの窓口及び新京成きっぷうりはま・定期券うりばを旧東西自由通路上に移設。

2025 1月23日

The NewDays Kiosk Matsudo Gate Outer store closed on this day.

Machine translation — show Japanese original

NewDay Kiosks松戸改札外店がこの日をもって閉店。

2025 2月27日

The departure melodies on the rapid transit line were changed to the standard JR East ones and transfer guidance for other lines was eliminated.

Machine translation — show Japanese original

快速線の発車メロディーがJR東日本標準のものに変更、他線乗換案内を削除。

2025 4月1日

With the merger of Shin-Keisei Electric Railway into Keisei Electric Railway, the stations on the Shin-Keisei Line became stations on the Keisei Electric Railway Matsudo Line and the station numbers were changed from SL01 to KS16 and then to KS88 for some stations but the provided information only mentions changing to KS88.

Machine translation — show Japanese original

新京成電鉄が京成電鉄への吸収合併に伴い、新京成電鉄新京成線の駅は京成電鉄松戸線の駅となる。同時に駅番号をSL01からKS88に変更。

2025 8月31日

The east entrance/exit of the bridge-style station building was closed and a connecting passageway to the Keisei Matsudo Line was established from the former east-west free passage.

Machine translation — show Japanese original

橋上駅舎の東口出入口を閉鎖、旧東西自由通路から京成松戸線への連絡通路設置。

2025 9月14日

The renewal of the Atre west entrance ticket gate was completed and the new toilet was opened for use, with the old toilet being closed.

Machine translation — show Japanese original

アトレ西口改札リニューアル竣工、新トイレ利用開始(旧トイレ閉鎖)。

2025 9月18日

A second-generation NewDays Matsudo gate-exit store opened in front of the Midori no Madoguchi.

Machine translation — show Japanese original

みどりの窓口前にNewDays松戸改札外店(2代目)がオープン。

2025 9月21日

The JR ticket sales office was relocated and the passage was changed accordingly.

Machine translation — show Japanese original

JRきっぷ売り場移設、それに伴う通路変更を実施。

2026

In the spring (planned): the east-west passage will be widened by JR East.

Machine translation — show Japanese original

春頃(予定):JR東日本により東西通路拡幅。

2027

In the spring (planned), a station building will open on the south side.

Machine translation — show Japanese original

春頃(予定):南側に駅ビルが開業。

2027 5月10日

The west stairway on the south side of the elevated station building was closed from this day, and the use of the west stairway on the north side of the elevated station building was resumed.

Machine translation — show Japanese original

橋上駅舎西口南側階段がこの日から閉鎖、橋上駅舎西口北側階段の利用を再開。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (JŌBAN LINE (RAPID))
1 Down
柏 · 取手 · 成田
2・3 Up
北千住 · 日暮里 · 上野
Platforms 1, 2, 3 serve this line

Transfers from this platform

Jōban Line (Local) Transit
2 min Easy
Shin-Keisei Line (SL) Keisei
5 min Moderate
PLATFORM LAYOUT (SHIN-KEISEI LINE (SL))
7・8
北習志野 · 京成津田沼
Platforms 7, 8 serve this line

Transfers from this platform

Jōban Line (Rapid) JR-East
5 min Moderate
Jōban Line (Local) Transit
5 min Moderate

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Matsudo Station FAQ

What train lines connect at Matsudo Station?

Matsudo Station is served by Jōban Line (Rapid), Shin-Keisei Line (SL).