小田原

Odawara Station

Live Network Status Active

Odawara is a railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
34 Events
1920 10月21日

The station opened simultaneously with the opening of the Atami Line between Odawara Station and the current station, and began handling passengers and freight.

Machine translation — show Japanese original

熱海線国府津駅 - 当駅間開通と同時に開業。旅客・貨物の取扱を開始。

1923 9月1日

The station building partially collapsed due to the Great Kantō earthquake.

Machine translation — show Japanese original

関東大震災により駅舎一部倒壊。

1925 3月25日

The Tōkaidō Main Line was extended to Atami Station, completing the entire Atami Line.

Machine translation — show Japanese original

熱海線が熱海駅まで全線開通。

1927 4月1日

The Odakyu Railway, now Odakyu Electric Railway, opened between Shinjuku Station and this station.

Machine translation — show Japanese original

小田原急行鉄道(現・小田急電鉄)新宿駅 - 当駅間が開通。

1934 12月1日

The station was transferred to Japanese National Railways and became part of the Tokaido Main Line.

Machine translation — show Japanese original

国鉄駅を東海道本線所属に変更。

1935 6月16日

The Daiyūzan Railway Line, now the Izuhakone Railway Daiyūzan Line, extended service to the station.

Machine translation — show Japanese original

大雄山鉄道線(現・伊豆箱根鉄道大雄山線)が当駅に乗り入れ。

1935 10月1日

Hakone Tozan Railway started serving the station.

Machine translation — show Japanese original

箱根登山鉄道が当駅に乗り入れ。

1948 10月

The Odakyu Romancecar service began operations.

Machine translation — show Japanese original

小田急ロマンスカー運行開始。

1950 3月1日

The Shonan Electric train service began operations.

Machine translation — show Japanese original

湘南電車運行開始。

1956 5月31日

The Hakone Tozan Railway Odawara City Line was abolished.

Machine translation — show Japanese original

箱根登山鉄道小田原市内線廃止。

1964 10月1日

It becomes a stop on the Tokaido Shinkansen.

Machine translation — show Japanese original

東海道新幹線の停車駅となる。

1970

The Shinkansen platform was extended to accommodate 16-car trains.

Machine translation — show Japanese original

新幹線のホームが16両対応に延伸される。

1973 5月20日

Cargo handling operations were consolidated at the newly established Nishi-Shō cargo station and handling at this station was abolished.

Machine translation — show Japanese original

新設の西湘貨物駅に貨物取扱業務を集約、当駅での取扱を廃止。

1973 11月1日

One escalator was installed on each of the up and down platforms for the Shinkansen towards Atami and began operation.

Machine translation — show Japanese original

新幹線の上下線ホーム熱海寄りにエスカレーターが1基ずつ設置され、供用開始。

1976 11月

The east plaza redevelopment and underground shopping street were completed.

Machine translation — show Japanese original

東口広場整備と地下街が完成。

1979 10月1日

The quadruple-tracking of the Ōfuna Station - Odawara Station section, known as the Tōkaidō Freight Line, was completed.

Machine translation — show Japanese original

大船駅 - 小田原駅間複々線化(東海道貨物線)完成。

1980 7月2日

The next day, the Showa Emperor and Empress Kojun visited Hakone Town, with an imperial train operating a return trip between Harajuku Station and Odawara Station.

Machine translation — show Japanese original

翌日にかけて昭和天皇、香淳皇后が箱根町へ行幸。原宿駅 - 小田原駅間でお召し列車が往復運転。

1980 10月1日

The Tōkaidō Shinkansen Hikari began making stops.

Machine translation — show Japanese original

東海道新幹線「ひかり」が停車開始。

1986 11月1日

Japanese National Railways discontinued luggage handling at its stations.

Machine translation — show Japanese original

国鉄駅での荷物取扱を廃止。

1987 3月31日

Freight handling was resumed at the Japanese National Railways station.

Machine translation — show Japanese original

国鉄駅での貨物取扱を再開。

1987 4月1日

The privatization of Japanese National Railways resulted in the Tokaido Main Line being inherited by JR East, the Tokaido Shinkansen by JR Central, and freight handling operations by JR Freight.

Machine translation — show Japanese original

国鉄分割民営化により、東海道本線はJR東日本、東海道新幹線はJR東海、貨物取扱業務はJR貨物が継承。

1995 11月13日

The JR conventional line started operating automatic ticket gates.

Machine translation — show Japanese original

JR在来線の自動改札機を設置し、供用開始。

1998 3月14日

Automatic ticket gates were installed on the Shinkansen and began operation.

Machine translation — show Japanese original

新幹線に自動改札機を設置し、供用開始。

2001 11月18日

IC card "Suica" becomes available for use on JR East.

Machine translation — show Japanese original

JR東日本でICカード「Suica」の利用が可能となる。

2002 12月1日

The Shonan-Shinjuku Line began operation.

Machine translation — show Japanese original

湘南新宿ライン運行開始。

2003 3月30日

The station switched to a new station building and a temporary west-east free passage was opened, with elevators, escalators, and multipurpose toilets installed by each operator.

Machine translation — show Japanese original

新駅舎へ切り替え・東西自由通路暫定開通。エレベーター・エスカレーター・多目的トイレが事業者ごとに設置される。

2003 12月20日

The east-west free passage was fully opened, and with the opening, the area under the Shinkansen elevated track was also redeveloped and restaurants and other shops opened.

Machine translation — show Japanese original

東西自由通路完全開通。開通に伴い、新幹線高架下も再整備され飲食店など出店。

2004 12月11日

The Odakyu Odawara Line's Rapid Express service is established, with the station serving as its terminal.

Machine translation — show Japanese original

小田急小田原線の快速急行が設定され、発着駅となる。

2005 6月25日

The east exit station building, Odawara Lasca, opened.

Machine translation — show Japanese original

東口に駅ビル(小田原ラスカ)オープン。

2006 3月18日

The use of Hakone Tozan Railway rolling stock for entry into Odawara Station was abolished, with all trains unified to use Odakyu Electric Railway rolling stock for services to Hakone-Yumoto.

Machine translation — show Japanese original

箱根登山鉄道の車両による小田原駅乗り入れが廃止。全列車が小田急電鉄の車両による箱根湯本行きに統一。

2008 3月15日

Express services to the Hakone Tozan Railway were discontinued, and with the abolition of semi-express services west of Shin-Matsuda, it was no longer a semi-express stop, and the new Platform 11 came into use.

Machine translation — show Japanese original

急行の箱根登山鉄道への乗り入れを廃止。準急の新松田以西運行廃止に伴い準急停車駅から外れる。新11番ホーム使用開始。

2013 8月19日

The Tōkaidō Line changed to a system where the doors are opened and closed by pressing a button located next to the doors when boarding trains originating from this station.

Machine translation — show Japanese original

東海道線のうち、当駅始発列車において、乗車の際ドアの脇にあるボタンを押して扉を開閉する方式に変更。

2014 11月1日

The departure melody of JR East was changed to "O-saru no kagoya".

Machine translation — show Japanese original

JR東日本の発車メロディが「お猿のかごや」に変更される。

2018 3月17日

The practice of having downbound Odakyu Odawara Line local trains enter the Hakone Tozan Railway was abolished.

Machine translation — show Japanese original

小田急小田原線からの下り各駅停車の箱根登山鉄道への乗り入れを廃止。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Departure Melodies
お猿のかごや
Tōkaidō Line 全ホーム共通 since 2014年11月1日

歌詞の中に「小田原提灯ぶら下げて」というフレーズがあることによる。

Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (ODAKYU ODAWARA LINE (OH))
Platform assignment not documented for this line yet

Transfers from this platform

Tōkaidō Line JR-East
5 min Moderate
Tokaido Shinkansen JR-Central
5 min Moderate
PLATFORM LAYOUT (TŌKAIDŌ LINE)
3・4 Down
熱海 · 伊東 · 沼津
5・6 Up
横浜 · 品川 · 東京
Platforms 3, 4, 5, 6 serve this line

Transfers from this platform

Odakyu Odawara Line (OH) Odakyu
5 min Moderate
Tokaido Shinkansen JR-Central
2 min Easy
PLATFORM LAYOUT (TOKAIDO SHINKANSEN)
13 Down
新大阪
14 Up
東京
Platforms 13, 14 serve this line

Transfers from this platform

Odakyu Odawara Line (OH) Odakyu
5 min Moderate
Tōkaidō Line JR-East
2 min Easy

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Odawara Station FAQ

What train lines connect at Odawara Station?

Odawara Station is served by Odakyu Odawara Line (OH), Tōkaidō Line, Tokaido Shinkansen.