新宿

Shinjuku Station

Live Network Status Active

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
116 Events
1885 3月1日

A Nippon Railway station opened in Tsunohazu Village, Minamitoshima District, Tokyo Prefecture, near the current location of LUMINE EST Shinjuku, and freight operations also commenced.

Machine translation — show Japanese original

東京府南豊島郡角筈村に日本鉄道の駅が開業(現在のルミネエスト新宿付近で開業)。貨物営業も開始。

1889 4月11日

Kobu Railway's station opened.

Machine translation — show Japanese original

甲武鉄道の駅が開業。

1904 1月

Work began on station improvement construction.

Machine translation — show Japanese original

駅改良工事に着手。

1906 3月1日

The station improvement work was completed, and at the same time, the station building was relocated to a site facing the Kōshū Kaidō, and the Kobu Railway's electric train platforms were set up in two locations, Kōshū-guchi Platform and Ōme-guchi Platform.

Machine translation — show Japanese original

駅改良工事が竣工。同時に甲州街道に面した場所(現在の東南口付近)に駅本屋を移転。甲武鉄道の電車ホームが甲州口ホームと青梅口ホームの2箇所設けられる(ホーム間は約350 m)。

1906 10月1日

Kobu Railway was nationalized under the Railway Nationalization Act.

Machine translation — show Japanese original

甲武鉄道が鉄道国有法により国有化。

1906 11月1日

Nippon Railway was nationalized under the Railway Nationalization Act.

Machine translation — show Japanese original

日本鉄道が鉄道国有法により国有化。

1909 10月12日

The line came under the Yamanote Line due to the designation of line names.

Machine translation — show Japanese original

線路名称制定により山手線の所属となる。

1915 5月1日

A Keiō Electric Railway (the predecessor to Keio Electric Railway) station opened above Kōshū Kaidō (at the time, it was called Teishajō-mae).

Machine translation — show Japanese original

京王電気軌道(京王電鉄の前身)の駅が甲州街道上に開業(当時は停車場前)。

1916 11月28日

A fire broke out at the Shinjuku Train Depot located within the station premises.

Machine translation — show Japanese original

駅構内にある新宿電車庫で火災が発生する。

1919 10月7日

Work began on station improvement projects, but was later severely damaged in the Great Kanto Earthquake.

Machine translation — show Japanese original

駅改良工事に着手(後の関東大震災により大破)。

1923 9月1日

The station building was severely damaged due to the Great Kantō earthquake.

Machine translation — show Japanese original

関東大震災により駅舎が大破する。

1923 12月2日

A station on the Teishō Denki Nishi-Tetsudō line, later the Toden Sugamo line, opened at the east exit.

Machine translation — show Japanese original

帝国電灯西武軌道線(のちの都電杉並線)の駅が東口に開業。

1924 7月13日

The Chuo Line (formerly Kobu Railway) consolidated the Koshu entrance platform and the Ome entrance platform into one location.

Machine translation — show Japanese original

中央線(旧甲武鉄道)甲州口ホームと青梅口ホームが1箇所に集約される。

1924 9月11日

The Ome entrance (South entrance) was opened.

Machine translation — show Japanese original

青梅口(南口)を開設。

1925 4月26日

A new station building was completed and underground passageways for passengers and small freight were opened for use.

Machine translation — show Japanese original

新駅舎が完成。旅客専用地下道及び小荷物専用地下道の供用開始。

1926 5月1日

The old station building located at Kōshū Kaidō-mouth was abolished.

Machine translation — show Japanese original

甲州街道口にあった旧駅舎が廃止される。

1926 6月1日

A freight transfer platform was newly established.

Machine translation — show Japanese original

貨物中継ホームを新設

1927 4月1日

Odakyu Railway's predecessor, Odakyu Electric Railway, opened a station.

Machine translation — show Japanese original

小田原急行鉄道(小田急電鉄の前身)の駅が開業。

1927 10月28日

The Keio Building was constructed and the station of Keio Electric Railway, the predecessor of Keio Electric Railway, was relocated to the first floor of the building.

Machine translation — show Japanese original

京王ビルを建設し、京王電気軌道(京王電鉄の前身)の駅が当ビルの1階に移転。

1932 11月21日

Freight transfer operations were abolished.

Machine translation — show Japanese original

貨物中継業務を廃止。

1937 4月1日

It was designated as a Special First-Class station.

Machine translation — show Japanese original

特別一等駅の指定を受ける。

1937 5月1日

A station of Keio Electric Railway, the predecessor of Keio Electric Railway, was renamed from Shinjuku Station to Keio Shinjuku Station.

Machine translation — show Japanese original

京王電気軌道(京王電鉄の前身)の駅が四谷新宿駅から京王新宿駅に改称。

1937 6月1日

Interoperability with Keio Electric Railway began.

Machine translation — show Japanese original

京王電気軌道との連絡運輸を開始。

1942 5月1日

Due to a merger during wartime, the Odakyu Electric Railway station became a Tokyo Kyuko Electric Railway Odawara Line station.

Machine translation — show Japanese original

戦時中の合併により小田急電鉄の駅が東京急行電鉄小田原線の駅となる。

1944 5月31日

Due to mergers during wartime, Keio Electric Railway stations became Tokyo Rapid Transit stations.

Machine translation — show Japanese original

戦時中の合併により京王電気軌道の駅が東京急行電鉄の駅となる。

1945 5月25日

It was damaged in an air raid.

Machine translation — show Japanese original

空襲で被災。

1945 7月24日

The starting point of the Tokyu Keio Line was temporarily relocated from Shinjuku-Nishiguchi Station to Japanese National Railways Shinjuku Station at the current west exit.

Machine translation — show Japanese original

東急京王線の起点が四谷新宿駅から国鉄青梅口(現在の西口)の新宿駅に暫定移転。

1947 1月23日

A transfer passage between the Tokyu Odawara Line and the Tokyu Keio Line was opened at Koshu Mouth.

Machine translation — show Japanese original

甲州口に東急小田原線と東急京王線との連絡口を開設。

1947 4月7日

A transfer passage to the Tokyu Odawara Line was opened in the Central Underground Passage.

Machine translation — show Japanese original

中央地下道に東急小田原線との連絡口を開設。

1948 6月1日

The breakup of Tokyo Kyuko Electric Railway resulted in Tokyo Kyuko Electric Railway stations becoming stations of Keio Teito Electric Railway (now Keio Electric Railway) and Odakyu Electric Railway.

Machine translation — show Japanese original

東京急行電鉄の分割により東京急行電鉄の駅が京王帝都電鉄(現・京王電鉄)および小田急電鉄の駅になる。

1950 6月5日

A collision accident occurred on the stub track on the Nishi-Shinjuku side of the Marunouchi Line platform, in which a non-revenue train collided with the bumper.

Machine translation — show Japanese original

丸ノ内線ホームの西新宿方にある引上線にて、回送列車が車止めに衝突する事故が発生する。詳細は営団地下鉄丸ノ内線新宿駅引上線衝突事故を参照。

1950 6月30日

Automatic ticket gates were installed at the south entrance and began operation.

Machine translation — show Japanese original

南口に自動改札機を設置し、供用開始。

1952 3月25日

Seibu-Shinjuku Station opened.

Machine translation — show Japanese original

西武新宿駅開業。

1955 10月

Student groups of passenger organizers were deployed to crowded Japanese National Railways platforms during rush hour, and came to be known as "pushers" due to their practice of pushing passengers into train cars.

Machine translation — show Japanese original

ラッシュ時に混雑する国鉄ホームに旅客整理係学生班が投入。乗客を車内に押し込む様子から「押し屋」と呼ばれるようになった。

1958 5月1日

The Central Underground Entrance was opened, providing access from the Central Underground Passage to the East Exit.

Machine translation — show Japanese original

中央地下道口を開設(中央地下道から東口への出入口)。

1959 3月15日

A station on the Teito Rapid Transit Authority Marunouchi Line opened.

Machine translation — show Japanese original

営団地下鉄丸ノ内線の駅が開業。

1961 2月8日

The Teito Rapid Transit Authority subway Ogikubo Line, now the Marunouchi Line segment between Shinjuku Station and Ogikubo Station, opened.

Machine translation — show Japanese original

営団地下鉄荻窪線(現在の丸ノ内線新宿駅 - 荻窪駅間)が開業。

1961 12月7日

The Japanese National Railways Kōshū-guchi station building was completely destroyed in a fire.

Machine translation — show Japanese original

国鉄甲州口(のちの南口)駅舎が火災で全焼。

1962 11月3日

Odakyu Department Store, now known as Odakyu Hale, opened.

Machine translation — show Japanese original

小田急百貨店(現在のハルク)がオープン。

1963 4月1日

Keio Teito Electric Railway's Shinjuku Station became an underground station, switching from a shared road and rail track.

Machine translation — show Japanese original

京王帝都電鉄の新宿駅が地下駅となる。道路との併用軌道から切り替え。

1963 7月1日

The use of low-floor freight platforms began.

Machine translation — show Japanese original

貨物低床ホームの使用開始。

1963 12月1日

The Toden Sugamo Line was abolished.

Machine translation — show Japanese original

都電杉並線廃止。

1963 12月20日

The Japanese National Railways Kōshū口 (Minami) station building was rebuilt.

Machine translation — show Japanese original

国鉄甲州口(南口)駅舎再建。

1964 2月17日

The first-phase major renovation of Odakyu Electric Railway Shinjuku Station was completed, becoming a three-dimensional terminal and starting the use of the underground platforms.

Machine translation — show Japanese original

小田急電鉄新宿駅第1次大改良工事完成。立体式ターミナルになり地下ホームの使用を開始する。

1964 3月1日

The station office portion of the Japanese National Railways east entrance station building, from the third basement to the second and sixth floors above ground, began operation.

Machine translation — show Japanese original

国鉄東口駅舎の駅務部分(地下3階から地上2階および6階)の使用を開始。

1964 5月18日

The Japanese National Railways east entrance station building with 8 floors above ground and 3 floors below, as well as the underground shopping street, were completed and opened on May 20.

Machine translation — show Japanese original

地上8階・地下3階の国鉄東口駅舎及び地下街が完成、オープンは5月20日。

1964 10月1日

The Japanese National Railways changed the 0th platform to platforms 1 and 2 and renumbered the other platforms sequentially from 3 to 10.

Machine translation — show Japanese original

国鉄の0番線ホームを1・2番線に変更し、他のホームを3番線から10番線に順番に番号を振り替える。

1964 11月10日

The Keio Department Store Shinjuku branch opened.

Machine translation — show Japanese original

京王百貨店新宿店がオープン。

1965 9月25日

The Midori-no-Madoguchi ticket office was opened.

Machine translation — show Japanese original

みどりの窓口が開設。

1966 11月30日

The elevated plaza in front of Nishiguchi Station was completed.

Machine translation — show Japanese original

西口駅前立体広場が完成。

1967 8月8日

A US military fuel transport train accident occurred, resulting in the cancellation of 1,100 Japanese National Railways trains.

Machine translation — show Japanese original

米軍燃料輸送列車事故が発生、国電1,100本が運休。

1967 11月21日

The Odakyu Shinjuku Station building, a 14-story above-ground and 3-story below-ground structure, was completed.

Machine translation — show Japanese original

地上14階・地下3階建の小田急新宿駅ビルが完成。

1968 6月1日

Odakyu Electric Railway began operating air conditioners on the platforms at Shinjuku Station.

Machine translation — show Japanese original

小田急電鉄新宿駅ホームにクーラーを設置し、供用開始。

1968 10月21日

The Shinjuku riot occurred and the student movement of Zengakuren became more active.

Machine translation — show Japanese original

新宿騒乱事件が発生。全学連の学生運動が活発化。

1969 6月28日

The Shinjuku West Exit Anti-War Folk Guerilla incident occurred, in which folk singers sang anti-war songs and up to 40,000 people gathered to protest the Vietnam War, but the police banned the assembly.

Machine translation — show Japanese original

新宿西口反戦フォークゲリラ事件が発生。フォークソングの歌手達が反戦歌などでベトナム戦争反対を訴え、最大で4万人が集結するが、警察が集会を禁止した。

1969 10月21日

The 10.21 International Anti-War Day struggle occurred, with radical groups intruding onto the tracks at Shinjuku Station.

Machine translation — show Japanese original

新宿駅線路内に過激派が乱入する10.21国際反戦デー闘争 が発生。

1970 3月26日

The Toden was abolished and streetcars disappeared from Shinjuku.

Machine translation — show Japanese original

都電が廃止され、新宿から路面電車が消滅。

1973 4月24日

The Capital Region National Railway riot broke out, with damage from destruction and arson also occurring within Shinjuku Station premises.

Machine translation — show Japanese original

首都圏国電暴動発生。新宿駅構内でも破壊・放火などの被害。

1974

In November, Japanese National Railways opened "Alps Plaza" inside its ticket gates.

Machine translation — show Japanese original

月:国鉄の改札内に「アルプスの広場」を開設。

1976 3月10日

The Japanese National Railways South Exit station building was rebuilt and Shinjuku Luminous opened.

Machine translation — show Japanese original

国鉄南口駅舎改築。新宿ルミネオープン。

1977 4月1日

The second major renovation of Odakyu Electric Railway's Shinjuku Station was completed, enabling both the ground-level and underground stations to accommodate 10-car train operations, among other improvements that enhanced transfers.

Machine translation — show Japanese original

小田急電鉄新宿駅第2次大改良工事完成。地上駅・地下駅とも10両編成運転に対応した|archivedate=2016-03-01|accessdate=2021-04-30|publisher=小田急電鉄|language=日本語|url-status=dead|url-status-date=2021-04}})ほか、乗り換えが改善された。

1977 9月1日

The Japanese National Railways south entrance concourse is expanded.

Machine translation — show Japanese original

国鉄南口コンコースの拡幅される。

1977 10月19日

The work to expand the Keio Teito Electric Railway's Shinjuku Station platform to accommodate 10-car train formations was completed.

Machine translation — show Japanese original

京王帝都電鉄の新宿駅ホームを10両編成化する工事が完成。

1977 11月15日

The yard function of the Japanese National Railways station was abolished.

Machine translation — show Japanese original

国鉄駅のヤード機能を廃止。

1978 10月31日

The Keio New Line opened.

Machine translation — show Japanese original

京王新線開業。

1978 11月17日

The Japanese National Railways east entrance station building was renovated and the station building name was changed to Shinjuku My City, later renamed Lumine Est Shinjuku.

Machine translation — show Japanese original

国鉄東口駅舎改装。駅ビル名が新宿マイシティ(のちのルミネエスト新宿)に改称。

1980 3月16日

The Toei Shinjuku Line station opened and mutual through-service operation with Keio Teito Electric Railway began.

Machine translation — show Japanese original

都営地下鉄新宿線の駅が開業し、京王帝都電鉄と相互乗り入れ開始。

1980 8月19日

The Shinjuku West Exit bus arson incident occurred.

Machine translation — show Japanese original

新宿西口バス放火事件発生。

1981 7月13日

Odakyu Electric Railway resumed the use of its underground station platforms and the underground stations also became compatible with 10-car train operations.

Machine translation — show Japanese original

小田急電鉄の地下駅ホームの使用を再び開始し、地下駅も10両運転対応となる。

1984 2月1日

Freight handling was abolished at Japanese National Railways stations.

Machine translation — show Japanese original

国鉄駅での貨物の取り扱いが廃止。

1984 10月4日

The station building "Shinjuku Mylord" opened at the south entrance.

Machine translation — show Japanese original

南口に駅ビル「新宿ミロード」がオープン。

1986 3月3日

The Japanese National Railways Saikyo Line operating section was extended, and the first platform, now platforms 1 and 2, began to be used, shifting the line numbers of the existing platforms.

Machine translation — show Japanese original

国鉄埼京線運行区間が延伸。第1ホーム(現1・2番線)を使用開始し既存ホームの番線がずれる。

1986 4月2日

Part of the Yokosuka Line temporary trains began operating at this station, sharing tracks 1 and 2.

Machine translation — show Japanese original

横須賀線臨時列車の一部が1・2番線を共用して当駅で運行を開始する。

1987 4月1日

With the privatization of Japanese National Railways, the station became a station of East Japan Railway Company (JR East), belonging to the Yamanote Line.

Machine translation — show Japanese original

国鉄分割民営化に伴い、国鉄の駅は東日本旅客鉄道(JR東日本)の駅(山手線所属)となる。

1988 10月20日

Lumine 2 entrance, later renamed the southeast ticket gate, opened.

Machine translation — show Japanese original

ルミネ2口(のちの東南改札)がオープン。

1991 1月16日

Odakyu Electric Railway installed automatic ticket gates at its west exit and began operation.

Machine translation — show Japanese original

小田急電鉄の西口に自動改札機を設置し、供用開始。

1991 2月23日

Keio Teito Electric Railway installed automatic ticket gates at its ticket gates and started operating them.

Machine translation — show Japanese original

京王帝都電鉄の改札口に自動改札機を設置し、供用開始。

1991 3月9日

Automatic ticket gates were installed at the east and central exits of JR and began operation.

Machine translation — show Japanese original

JRの東口、中央口に自動改札機を設置し、供用開始。

1991 3月16日

The new south exit of JR opened, and automatic ticket gates began operating simultaneously.

Machine translation — show Japanese original

JRの新南口がオープン。同時に自動改札機の供用開始。

1991 3月19日

The introduction of the Narita Express service led to the commencement of using the second platform, now platforms 3 and 4, resulting in a shift of the existing platform line numbers, and automatic ticket gates were installed and put into operation at the west exit and Odakyu exit.

Machine translation — show Japanese original

「成田エクスプレス」運転開始により第2ホーム(現3・4番線)を使用開始し、既存ホームの番線がずれる。西口、小田急口に自動改札機を設置し、供用開始。

1993 12月1日

The timetable revision abolished the entry of mid-distance trains on the Chuo Main Line at this station.

Machine translation — show Japanese original

ダイヤ改正で、中央本線の中距離列車の当駅乗り入れを廃止。

1995 4月1日

Automatic ticket gates were installed at the southeast exit of JR and began operation.

Machine translation — show Japanese original

JRの東南口に自動改札機を設置し、供用開始。

1995 5月5日

The Matsumoto sarin gas attack perpetrator's accomplice, a former Aum Shinrikyo member, carried out the Tokyo subway sarin gas attack at this station, also known as the Shinjuku Station cyanide gas incident.

Machine translation — show Japanese original

当駅で青酸ガス事件が発生(新宿駅青酸ガス事件、オウム真理教(→アーレフ)の元信者の犯行)。

1996 3月9日

Automatic ticket gates were installed at the transfer gates between JR and Odakyu, and began operation.

Machine translation — show Japanese original

JRと小田急の連絡改札口に自動改札機を設置し、供用開始。

1997 12月19日

Toei Oedo Line stations opened.

Machine translation — show Japanese original

都営地下鉄大江戸線の駅が開業。

2000

A JR East station was selected as one of the Kanto's 100 best stations, while Odakyu, Keio, Toei, and Eidan (at the time) were not eligible for selection.

Machine translation — show Japanese original

JR東日本の駅が関東の駅百選に選定される。小田急・京王・都営・営団(当時)は選定対象になっていない。

2001 3月27日

The Keio Line's timetable revision resulted in the establishment of a new semi-express service, with this station as its starting and terminating point.

Machine translation — show Japanese original

京王線のダイヤ改定により準特急が新設され、その始発・終着駅となる。

2001 11月18日

The IC card "Suica" becomes available for use.

Machine translation — show Japanese original

ICカード「Suica」の利用が可能となる。

2001 12月1日

The Shonan-Shinjuku Line began stopping.

Machine translation — show Japanese original

湘南新宿ラインが停車を開始。

2002 3月23日

The Odawara Line had the Shonan Express service established on it, making it the terminal station.

Machine translation — show Japanese original

小田原線に湘南急行が設定され、発着駅となる。

2003 2月1日

With the Kōshū Kaidō overpass replacement work, the Chuo Line limited express platform was relocated to the current temporary platform, and construction began on the existing third platform.

Machine translation — show Japanese original

甲州街道跨線橋架け替え工事に伴い、中央線特急の発着ホームを現在使用の仮設ホームに移転。既存の第3ホームの工事開始。

2004 4月1日

With the privatization of Teito Rapid Transit Authority (Eidan), the stations on the Marunouchi Line were inherited by Tokyo Metro.

Machine translation — show Japanese original

帝都高速度交通営団(営団地下鉄)民営化に伴い、丸ノ内線の駅は東京地下鉄(東京メトロ)に継承される。

2004 9月25日

With the Kōshū Kaidō overpass replacement work, the Chuo Line rapid up platform was relocated to the third platform, which was under construction, and work began on the fourth platform that had been used until then.

Machine translation — show Japanese original

甲州街道跨線橋架け替え工事に伴い、中央線快速上りの発着ホームを工事中だった第3ホームに移転。それまで使っていた第4ホームの工事開始。

2004 12月11日

The Odawara Line had rapid express and section semi-express services established, with trains arriving and departing at its terminal stations.

Machine translation — show Japanese original

小田原線に快速急行・区間準急が設定され、発着駅となる{{Cite press release|和書|url=http://www.d-cue.com/cgi-bin/info/pg02348.pl?key=869&info_kubun=d-cue&mode=online |archiveurl=https://web.archive.org/web/20050308101903/http://www.d-cue.com/cgi-bin/info/pg02348.pl?key=869&info_kubun=d-cue&mode=online|

2006 3月18日

The Tobu Nikko Line direct express "Spacia Nikko/Kinugawa" started operating.

Machine translation — show Japanese original

東武日光線直通特急「(スペーシア)日光・きぬがわ」が運行開始。

2006 4月16日

The South Terrace entrance opened with the Kōshū Kaidō overpass replacement work, the Chuo Line rapid down platform was relocated to the 4th platform which was under construction, and construction began on the 5th platform that was previously in use.

Machine translation — show Japanese original

甲州街道跨線橋架け替え工事に伴い、サザンテラス口がオープン。中央線快速下りの発着ホームを工事中だった第4ホームに移転。それまで使っていた第5ホームの工事開始。

2007

At JR Shinjuku Station, the track numbers for the Yamanote, Chuo, and Sobu lines' local trains were shifted up by 2 (tracks 11-14 → tracks 13-16) due to the expansion of the Chuo Line rapid and limited express platforms.

Machine translation — show Japanese original

JR新宿駅で、中央線快速・特急ホーム増床に伴い、山手線・中央・総武線各駅停車の番線番号を2ずつ繰り上げ(11 - 14番線→13 - 16番線)。

2007 3月18日

IC card "PASMO" becomes available for use on Odakyu Electric Railway, Keio Electric Railway, Tokyo Metro, and Toei Subway.

Machine translation — show Japanese original

小田急電鉄・京王電鉄・東京メトロ・都営地下鉄でICカード「PASMO」の利用が可能となる。

2007 4月15日

The Chuo Line rapid down platform was relocated to the fifth platform (11 and 12), which was under construction, due to the Koshu Kaido overpass replacement work, and construction began on the fourth platform (9 and 10), which was previously in use.

Machine translation — show Japanese original

甲州街道跨線橋架け替え工事に伴い、中央線快速下りの発着ホームを工事中だった第5ホーム(11・12番線)に移転。それまで使っていた第4ホーム(9・10番線)の工事開始。

2007 11月25日

With the Kōshū Kaidō overpass replacement work, the Chuo Line limited express platform was relocated from the temporary platform to the under-construction Platform 4.

Machine translation — show Japanese original

甲州街道跨線橋架け替え工事に伴い、中央線特急の発着ホームを仮設ホームから工事中の第4ホームに移転。

2008 3月15日

With the timetable revision, the platforms for the Narita Express and through limited express services on the Tobu Line were relocated from Platform 2 to a temporary platform.

Machine translation — show Japanese original

ダイヤ改正で、「成田エクスプレス」や東武線直通特急などの発着ホームを第2ホームから仮設ホームに移転。

2010 11月28日

The new south exit was relocated due to the Kōshū Kaidō overpass replacement construction.

Machine translation — show Japanese original

甲州街道跨線橋架け替え工事に伴い、新南口を移設。

2018 3月17日

The station became the terminus of the new commuter express service on the Odakyu Line due to a timetable revision.

Machine translation — show Japanese original

ダイヤ改正により、小田急線で新設された通勤急行の終着駅となる。

2018 11月28日

For approximately three months from this day, a trial experiment of the booth-type "STATION BOOTH" of the station-in shared office "STATION WORK" was conducted inside the Kōshū Kaidō ticket gate.

Machine translation — show Japanese original

この日より約3か月間、駅ナカシェアオフィス「STATION WORK」のブース型「STATION BOOTH」の実証実験を、甲州街道改札内にて実施。

2019

Reiwa 1

Machine translation — show Japanese original

(令和元年)

2019 8月1日

The STATION BOOTH service was officially launched.

Machine translation — show Japanese original

「STATION BOOTH」を本格開始。

2019 9月2日

Sagami Railway's vehicles made their initial entry for testing and press preview prior to mutual direct operation with Japanese National Railways.

Machine translation — show Japanese original

相模鉄道の車両が初乗り入れ(JRとの相互直通運転前の試験および報道公開)。

2019 11月30日

Direct service on the Sagami Line began, with most trains originating and terminating at this station, but some trains also extended to the Saikyo Line for Musashiurawa and Omiya.

Machine translation — show Japanese original

相鉄線への直通運転の開始。基本的には当駅発着となるが、一部電車は埼京線武蔵浦和・大宮方面に乗り入れ。

2020 2月25日

The business of the View Plaza outside the New South Gate ticket gate was closed.

Machine translation — show Japanese original

新南口改札外のびゅうプラザの営業を終了。

2020 7月19日

The east-west free passage was opened to use.

Machine translation — show Japanese original

東西自由通路が供用開始。

2022 1月16日

Byū Plaza ended its operations.

Machine translation — show Japanese original

びゅうプラザの営業を終了。

2022 3月1日

Ekinaka Concierge (Higashi-guchi and Shin-minami) opened.

Machine translation — show Japanese original

駅たびコンシェルジュ(東口・新南)が開業。

2022 10月2日

Odakyu Department Store Shinjuku Store main building ended operations.

Machine translation — show Japanese original

小田急百貨店新宿店本館の営業を終了。

2025 10月1日

JR East started the Eki-net Q-Chike service.

Machine translation — show Japanese original

JR東日本でえきねっとQチケのサービスを開始。

2026

Within the fiscal year, the use of slit-frame platform doors is scheduled to begin on the JR East 13 and 16 platform lines (Chuo and Sobu local lines).

Machine translation — show Japanese original

年度内:JR東日本の13・16番線(中央・総武線各駅停車)ホームでスリットフレームホームドアの使用を開始(予定)。

2026 7月31日

The Ekinaka Concierge (East Exit) is scheduled to cease operations.

Machine translation — show Japanese original

駅たびコンシェルジュ(東口)の営業を終了(予定)。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Departure Melodies
ミツバチの兄弟
1番線
きらめく小川
1番線
No longer played
新たな季節
テイチク(→櫻井音楽工房) library
By line
Marunouchi Line
A-line
Honeybee Brothers
B-line
Glittering Stream
Ōedo Line
B-line
Sunao na Kokoro
Other direction's melody title unconfirmed.
Shinjuku Line
B-line
Sunao na Kokoro
Other direction's melody title unconfirmed.
Landmarks
Tokyo Metropolitan Government Building Shinjuku Gyoen Kabukicho Busta Shinjuku
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (CHŪŌ LINE (RAPID))
7・8 Up
御茶ノ水 · 東京方面特急「あずさ」「かいじ」
9・10 Down
大月 · 甲府 · 松本
11・12 Down
中野 · 立川 · 高尾
Platforms 7, 8, 9, 10, 11, 12 serve this line

Transfers from this platform

Chūō–Sōbu Line (Local) JR-East
3 min Moderate
Fukutoshin Line Tokyo Metro
3 min Moderate
Keio Line Keio
10 min Hard
Show 7 more transfers
Marunouchi Line Tokyo Metro
3 min Moderate
Odakyu Odawara Line (OH) Odakyu
10 min Hard
Saikyō Line JR-East
3 min Moderate
Shōnan–Shinjuku Line JR-East
3 min Moderate
Ōedo Line Tokyo Metro
10 min Hard
Shinjuku Line Tokyo Metro
10 min Hard
Yamanote Line JR-East
3 min Moderate
PLATFORM LAYOUT (CHŪŌ–SŌBU LINE (LOCAL))
13 Up
水道橋 · 秋葉原 · 千葉
16 Down
東中野 · 中野 · 三鷹
Platforms 13, 16 serve this line

Transfers from this platform

Chūō Line (Rapid) JR-East
3 min Moderate
Fukutoshin Line Tokyo Metro
3 min Moderate
Keio Line Keio
10 min Hard
Show 7 more transfers
Marunouchi Line Tokyo Metro
3 min Moderate
Odakyu Odawara Line (OH) Odakyu
10 min Hard
Saikyō Line JR-East
3 min Moderate
Shōnan–Shinjuku Line JR-East
3 min Moderate
Ōedo Line Tokyo Metro
10 min Hard
Shinjuku Line Tokyo Metro
10 min Hard
Yamanote Line JR-East
3 min Moderate
PLATFORM LAYOUT (FUKUTOSHIN LINE)
Platform assignment not documented for this line yet

Transfers from this platform

Chūō Line (Rapid) JR-East
3 min Moderate
Chūō–Sōbu Line (Local) JR-East
3 min Moderate
Keio Line Keio
10 min Hard
Show 7 more transfers
Marunouchi Line Tokyo Metro
3 min Moderate
Odakyu Odawara Line (OH) Odakyu
10 min Hard
Saikyō Line JR-East
3 min Moderate
Shōnan–Shinjuku Line JR-East
3 min Moderate
Ōedo Line Tokyo Metro
10 min Hard
Shinjuku Line Tokyo Metro
10 min Hard
Yamanote Line JR-East
3 min Moderate
PLATFORM LAYOUT (KEIO LINE)
4
京王八王子 · 高尾山口 · 橋本
Platform 4 serves this line

Transfers from this platform

Chūō Line (Rapid) JR-East
10 min Hard
Chūō–Sōbu Line (Local) JR-East
10 min Hard
Fukutoshin Line Tokyo Metro
10 min Hard
Show 7 more transfers
Marunouchi Line Tokyo Metro
10 min Hard
Odakyu Odawara Line (OH) Odakyu
10 min Hard
Saikyō Line JR-East
10 min Hard
Shōnan–Shinjuku Line JR-East
10 min Hard
Ōedo Line Tokyo Metro
10 min Hard
Shinjuku Line Tokyo Metro
10 min Hard
Yamanote Line JR-East
10 min Hard
PLATFORM LAYOUT (MARUNOUCHI LINE)
1
荻窪 · 方南町
2
池袋
Platforms 1, 2 serve this line

Transfers from this platform

Chūō Line (Rapid) JR-East
3 min Moderate
Chūō–Sōbu Line (Local) JR-East
3 min Moderate
Fukutoshin Line Tokyo Metro
3 min Moderate
Show 7 more transfers
Keio Line Keio
10 min Hard
Odakyu Odawara Line (OH) Odakyu
10 min Hard
Saikyō Line JR-East
3 min Moderate
Shōnan–Shinjuku Line JR-East
3 min Moderate
Ōedo Line Tokyo Metro
10 min Hard
Shinjuku Line Tokyo Metro
10 min Hard
Yamanote Line JR-East
3 min Moderate
PLATFORM LAYOUT (ODAKYU ODAWARA LINE (OH))
Platform assignment not documented for this line yet

Transfers from this platform

Chūō Line (Rapid) JR-East
10 min Hard
Chūō–Sōbu Line (Local) JR-East
10 min Hard
Fukutoshin Line Tokyo Metro
10 min Hard
Show 7 more transfers
Keio Line Keio
10 min Hard
Marunouchi Line Tokyo Metro
10 min Hard
Saikyō Line JR-East
10 min Hard
Shōnan–Shinjuku Line JR-East
10 min Hard
Ōedo Line Tokyo Metro
10 min Hard
Shinjuku Line Tokyo Metro
10 min Hard
Yamanote Line JR-East
10 min Hard
PLATFORM LAYOUT (SAIKYŌ LINE)
1・2・3・4 Up
池袋 · 大宮 · 川越
Platforms 1, 2, 3, 4 serve this line

Transfers from this platform

Chūō Line (Rapid) JR-East
3 min Moderate
Chūō–Sōbu Line (Local) JR-East
3 min Moderate
Fukutoshin Line Tokyo Metro
3 min Moderate
Show 7 more transfers
Keio Line Keio
10 min Hard
Marunouchi Line Tokyo Metro
3 min Moderate
Odakyu Odawara Line (OH) Odakyu
10 min Hard
Shōnan–Shinjuku Line JR-East
3 min Moderate
Ōedo Line Tokyo Metro
10 min Hard
Shinjuku Line Tokyo Metro
10 min Hard
Yamanote Line JR-East
3 min Moderate
PLATFORM LAYOUT (SHŌNAN–SHINJUKU LINE)
1・2 Down
横浜 · 大船 · 小田原
4 Up
大宮 · 宇都宮 · 高崎
Platforms 1, 2, 4 serve this line

Transfers from this platform

Chūō Line (Rapid) JR-East
3 min Moderate
Chūō–Sōbu Line (Local) JR-East
3 min Moderate
Fukutoshin Line Tokyo Metro
3 min Moderate
Show 7 more transfers
Keio Line Keio
10 min Hard
Marunouchi Line Tokyo Metro
3 min Moderate
Odakyu Odawara Line (OH) Odakyu
10 min Hard
Saikyō Line JR-East
3 min Moderate
Ōedo Line Tokyo Metro
10 min Hard
Shinjuku Line Tokyo Metro
10 min Hard
Yamanote Line JR-East
3 min Moderate
PLATFORM LAYOUT (ŌEDO LINE)
6
六本木 · 大門
7
都庁前 · 光が丘
Platforms 6, 7 serve this line

Transfers from this platform

Chūō Line (Rapid) JR-East
10 min Hard
Chūō–Sōbu Line (Local) JR-East
10 min Hard
Fukutoshin Line Tokyo Metro
10 min Hard
Show 7 more transfers
Keio Line Keio
10 min Hard
Marunouchi Line Tokyo Metro
10 min Hard
Odakyu Odawara Line (OH) Odakyu
10 min Hard
Saikyō Line JR-East
10 min Hard
Shōnan–Shinjuku Line JR-East
10 min Hard
Shinjuku Line Tokyo Metro
10 min Hard
Yamanote Line JR-East
10 min Hard
PLATFORM LAYOUT (SHINJUKU LINE)
5
本八幡
Platform 5 serves this line

Transfers from this platform

Chūō Line (Rapid) JR-East
10 min Hard
Chūō–Sōbu Line (Local) JR-East
10 min Hard
Fukutoshin Line Tokyo Metro
10 min Hard
Show 7 more transfers
Keio Line Keio
10 min Hard
Marunouchi Line Tokyo Metro
10 min Hard
Odakyu Odawara Line (OH) Odakyu
10 min Hard
Saikyō Line JR-East
10 min Hard
Shōnan–Shinjuku Line JR-East
10 min Hard
Ōedo Line Tokyo Metro
10 min Hard
Yamanote Line JR-East
10 min Hard
PLATFORM LAYOUT (YAMANOTE LINE)
14 Up
原宿 · 渋谷 · 品川
15 Down
池袋 · 田端 · 上野
Platforms 14, 15 serve this line

Transfers from this platform

Chūō Line (Rapid) JR-East
3 min Moderate
Chūō–Sōbu Line (Local) JR-East
3 min Moderate
Fukutoshin Line Tokyo Metro
3 min Moderate
Show 7 more transfers
Keio Line Keio
10 min Hard
Marunouchi Line Tokyo Metro
3 min Moderate
Odakyu Odawara Line (OH) Odakyu
10 min Hard
Saikyō Line JR-East
3 min Moderate
Shōnan–Shinjuku Line JR-East
3 min Moderate
Ōedo Line Tokyo Metro
10 min Hard
Shinjuku Line Tokyo Metro
10 min Hard

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Shinjuku Station FAQ

What train lines connect at Shinjuku Station?

Shinjuku Station is served by Chūō Line (Rapid), Chūō–Sōbu Line (Local), Fukutoshin Line, Keio Line, Marunouchi Line, Odakyu Odawara Line (OH), Saikyō Line, Shōnan–Shinjuku Line, Ōedo Line, Shinjuku Line, Yamanote Line.

What are the major landmarks near Shinjuku Station?

Key landmarks accessible from this station include: Tokyo Metropolitan Government Building, Shinjuku Gyoen, Kabukicho, Busta Shinjuku.