新橋

Shimbashi Station

Live Network Status Active

Shimbashi is a major railway station in Tokyo.

Riding today

Live departures from this station
Real-time Departures
Connecting to Operator Mainframe...

About this station

History, melodies, surroundings
Station History & Timeline
26 Events
1909 12月16日

It opened as Karakawa Station of the Railway Institute and was a passenger station with only passenger operations.

Machine translation — show Japanese original

鉄道院の烏森駅として仮本屋で開業。旅客営業のみの旅客駅。

1910 3月1日

A pay public toilet was installed, with a usage fee of 2 sen for both Japanese-style and Western-style facilities.

Machine translation — show Japanese original

有料公衆トイレが設置された。使用料は和式・洋式ともに2銭。

1914 3月30日

A brick-built station building was completed.

Machine translation — show Japanese original

煉瓦造りの本屋が竣工。

1914 12月20日

With the opening of Tokyo Station, the station was renamed Shinbashi Station, and the former Shinbashi Station was renamed Shiodome Station.

Machine translation — show Japanese original

東京駅の開業に伴い、新橋駅に改称。同時に従来の新橋駅は汐留駅に改称された。

1925

The station house was partially rebuilt.

Machine translation — show Japanese original

駅本屋を一部改築。

1949 6月1日

Japanese National Railways was established.

Machine translation — show Japanese original

日本国有鉄道が発足。

1963 2月

Automatic ticket gates were experimentally installed.

Machine translation — show Japanese original

自動入鋏器が試験的に設置される。

1963 2月8日

The Shiodome Signal Box was established when the No. 1 Line's Ningyocho - Higashi-Ginza section opened.

Machine translation — show Japanese original

1号線の人形町 - 東銀座間の開業時に汐留信号所が開設。

1963 12月12日

The station opened as the terminal station when the 1st line was extended from Higashi-Ginza Station, and the Shiodome Signal Station was abolished.

Machine translation — show Japanese original

1号線東銀座駅から延伸された際の終着駅として開業。汐留信号所は廃止。

1964 12月12日

The No. 1 line was extended to Daimon, and it became an intermediate station.

Machine translation — show Japanese original

1号線が大門まで延伸され、途中駅となる。

1968 9月25日

The station building was relocated under the Tokaido Shinkansen elevated tracks.

Machine translation — show Japanese original

駅本屋を東海道新幹線高架下に移転。

1968 10月1日

Freight handling was abolished.

Machine translation — show Japanese original

荷物の取り扱いを廃止。

1976 10月1日

New platforms for the Yokosuka Line, which had been shared with the Tokaido Line, were newly established underground, initially serving Sobu Rapid Line trains bound for Shinagawa, with Yokosuka Line trains beginning to use the underground platforms from October 1, 1980.

Machine translation — show Japanese original

これまで東海道線と共用していた横須賀線のホームを地下に新設。新設当初は総武快速線からの品川行き列車が停車。横須賀線列車は1980年(昭和55年)10月1日から地下ホーム発着となる。

1987 4月1日

With the privatization of Japanese National Railways, it became a station of East Japan Railway Company (JR East).

Machine translation — show Japanese original

国鉄分割民営化に伴い、東日本旅客鉄道(JR東日本)の駅となる。

1988 3月13日

With the start of rapid service on the Keihin-Tohoku Line, the line passes through during the daytime.

Machine translation — show Japanese original

京浜東北線の快速運転開始に伴い、日中は同線が通過するようになる。

1990 11月17日

Automatic ticket gates were installed at Karasumoguchi.

Machine translation — show Japanese original

烏森口に自動改札機を設置。

1990 11月24日

Automatic ticket gates were installed at the Hibiya entrance and the Ginza entrance.

Machine translation — show Japanese original

日比谷口、銀座口に自動改札機を設置。

1990 12月1日

Automatic ticket gates were installed at the Shiodome underground entrance.

Machine translation — show Japanese original

汐留地下口に自動改札機を設置。

2001 11月18日

The IC card "Suica" becomes available for use.

Machine translation — show Japanese original

ICカード「Suica」の利用が可能となる。

2013 4月21日

The Tōkaidō Main Line platform expansion work was implemented.

Machine translation — show Japanese original

東海道本線プラットホーム拡幅工事を実施。

2015 3月14日

The Utsunomiya Line, Takasaki Line, and Joban Line began operating through services with the opening of the Ueno-Tokyo Line.

Machine translation — show Japanese original

上野東京ライン開業により、宇都宮線・高崎線・常磐線の乗り入れを開始。

2019

Reiwa 1

Machine translation — show Japanese original

(令和元年)

2019 10月5日

Platform doors began to be used.

Machine translation — show Japanese original

ホームドアの使用を開始。

2019 10月20日

The ticket sales office ended its business operations.

Machine translation — show Japanese original

定期券発売所が営業を終了。

2022 3月28日

The in-station commercial facility Ecute Edition Shinbashi opened.

Machine translation — show Japanese original

駅ナカ商業施設「エキュートエディション新橋」が開業。

2025 10月1日

The Ekinet Q-Chike service was started.

Machine translation — show Japanese original

えきねっとQチケのサービスを開始。

Timeline adapted from Japanese Wikipedia, available under CC BY-SA 4.0.

Departure Melodies
スタートライン
1番線
Fast River
1番線
By line
Ginza Line
A-line
Start Line
B-line
Fast River
Asakusa Line
B-line
Sunao na Kokoro
Uniform network-wide since 2019; Sengakuji and Oshiage kept their prior sound for through-service coordination with Keikyu/Tobu. Other direction's melody title unconfirmed.
Landmarks
Residential Area
Accessibility
Standard Access

Getting around

Platforms, transfers and navigation
Platform Layout & Transfers
PLATFORM LAYOUT (GINZA LINE)
1 Down
2 Up
Platforms 1, 2 serve this line

Transfers from this platform

Keihin–Tōhoku Line JR-East
5 min Moderate
Asakusa Line Tokyo Metro
2 min Easy
Tōkaidō Line JR-East
5 min Moderate
Show 3 more transfers
Ueno-Tokyo Line Transit
2 min Easy
Yamanote Line JR-East
5 min Moderate
Yokosuka Line JR-East
2 min Easy
PLATFORM LAYOUT (KEIHIN–TŌHOKU LINE)
1 Down
2 Up
Platforms 1, 2 serve this line

Transfers from this platform

Ginza Line Tokyo Metro
5 min Moderate
Asakusa Line Tokyo Metro
5 min Moderate
Tōkaidō Line JR-East
2 min Easy
Show 3 more transfers
Ueno-Tokyo Line Transit
5 min Moderate
Yamanote Line JR-East
2 min Easy
Yokosuka Line JR-East
5 min Moderate
PLATFORM LAYOUT (ASAKUSA LINE)
1 Down
2 Up
Platforms 1, 2 serve this line

Transfers from this platform

Ginza Line Tokyo Metro
2 min Easy
Keihin–Tōhoku Line JR-East
5 min Moderate
Tōkaidō Line JR-East
5 min Moderate
Show 3 more transfers
Ueno-Tokyo Line Transit
2 min Easy
Yamanote Line JR-East
5 min Moderate
Yokosuka Line JR-East
2 min Easy
PLATFORM LAYOUT (TŌKAIDŌ LINE)
1 Down
2 Up
Platforms 1, 2 serve this line

Transfers from this platform

Ginza Line Tokyo Metro
5 min Moderate
Keihin–Tōhoku Line JR-East
2 min Easy
Asakusa Line Tokyo Metro
5 min Moderate
Show 3 more transfers
Ueno-Tokyo Line Transit
5 min Moderate
Yamanote Line JR-East
2 min Easy
Yokosuka Line JR-East
5 min Moderate
PLATFORM LAYOUT (YAMANOTE LINE)
1 Down
2 Up
Platforms 1, 2 serve this line

Transfers from this platform

Ginza Line Tokyo Metro
5 min Moderate
Keihin–Tōhoku Line JR-East
2 min Easy
Asakusa Line Tokyo Metro
5 min Moderate
Show 3 more transfers
Tōkaidō Line JR-East
2 min Easy
Ueno-Tokyo Line Transit
5 min Moderate
Yokosuka Line JR-East
5 min Moderate
PLATFORM LAYOUT (YOKOSUKA LINE)
1 Down
2 Up
Platforms 1, 2 serve this line

Transfers from this platform

Ginza Line Tokyo Metro
2 min Easy
Keihin–Tōhoku Line JR-East
5 min Moderate
Asakusa Line Tokyo Metro
2 min Easy
Show 3 more transfers
Tōkaidō Line JR-East
5 min Moderate
Ueno-Tokyo Line Transit
2 min Easy
Yamanote Line JR-East
5 min Moderate

Community Photos

Photos shared by riders. Been to this station? Add yours.

Loading photos…

Shimbashi Station FAQ

What train lines connect at Shimbashi Station?

Shimbashi Station is served by Ginza Line, Keihin–Tōhoku Line, Asakusa Line, Tōkaidō Line, Yamanote Line, Yokosuka Line.